Title Page

  • Conducted on

  • Prepared by

  • Location
  • Property Address:

  • Consent

  • Lot

  • Name of LBP: (If not on site, ask who the foundation LBP is)

  • LBP Onsite:  Yes  No

  • License No: (if sighted)

  • License sighted:  Yes  No

  • Expiry Date:

  • Wind Zone

  •  Approved BC documents and amendments on site

  •  Correct address and Lot No

  •  Consent conditions checked

Siting

  •  Siting as per approved plans, pegs checked

  •  Retaining walls: Nova flow, PS if surcharge or >1.5m Ht

  •  Building height to boundary

  • Surveyors report  Received  Outstanding  NA

Excavations

  •  Ground bearing acceptable

  •  Specific foundation design

  •  Engineer supervision

  •  Hazards: floor heights & flood levels, ground stability

  •  Council drains under building

  •  Excavation: safe slope

Foundation - piled/drilled/driven foundations

  •  Pile heights correct for type of bracing element

  •  Pile depth correct for pile type

  •  Pile spacing for bearers

  •  Floor height to ground level, 450mm crawl space

  •  Footing: width, depth, clean, level

  •  Anchor piles / brace piles - Layout matches plans

  •  Driven piles

  •  Discuss fixing protection: galvanised / stainless

  •  No water ponding under floor

Concrete/Raft slab foundations

  •  Sand / hard fill compaction (certificate if fill >600mm)

  •  Monolithic: slabs / footings, insulation as per plans

  •  DPM Polythene: thickness, lapped & taped, no damage

  •  Foundations: dimensions, depth, clean, square, level

  •  Floor height to finished ground levels

  •  Steel: type, size, spacing, coverage, clean, laps, ties

  •  Reinforcing mesh / type / size / laps / supplementary rods

  •  Slab thickness / floor thickenings

  •  Lift mesh / chairs / saw cuts / free joints

  •  Bottom plate connectors

  •  Tanking / drainage for split level

  •  Engineer designed foundations

Required Documentation

  • PS4 Sand-pad

  • PS4 Foundations

  • PS4 Underfloor Insulation

  • ROW Foundations  Received  Outstanding

Building

  •  Discuss floor / ground levels & accessibility requirements

  •  Hazards: floor / flood heights, ground stability

OUTCOME OF DECISION

  • PASS

  •  FAIL. But work may proceed to next inspection

  •  FAIL. Repeat inspection required  Additional fee

  • Officer Name:

  • Signature :

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.