Title Page
-
Site conducted
-
Conducted on
-
Contractor Company
- Cross Verwijmeren
- Cheela Plains Contracting
- Yurduba
- East Pilbara Earthmoving
- Jilpanti Enterprises
- COLAS Gabon
- La Forrestier
-
Prepared by
-
Location
-
Asset Number
-
Machine Hrs/Kms
On Ground Inspection
-
Overall Machine Appearance
-
Asset ID on Three Sides
-
Bucket, G.E.T. condition
-
Boom/Stick Condition
-
Boom, Stick and Bucket Cylinder Condition
-
Other Attachments, Rock Breaker and Ripper
-
Protective Screen in Place or with Machine
-
Fuel/Oil/Air lines and Hoses
-
Track Chains and Shoes
-
Idlers, Rollers, Sprockets and Final Drives
-
Access Steps and Handrails
-
Self Closing Gate to Platform
-
Battery and Starter Isolator Functional
-
Battery Cover and security
On Machine and Cabin Inspection
-
Fire Suppression (In Date and Charged)
-
Portable Fire Extinguishers Mounted Securely and In Date
-
Operators Manual Present
-
Pre Start Book Present or Electronically Filed
-
First Aid Kit in Date and has Tamper Proof Seal
-
Mirrors and Cameras (If Fitted)
-
Window Condition
-
Seat Condition and Function
-
Seat Belts and Function
-
Engine Information System/Gauges Operational
-
EEMIS Mounted and Functional
-
Weed and Seed Inspection Current
-
Overall Cabin Condition
Operational Inspection
-
Machine Movements
-
Hydraulic Lock Out Functional
-
Beacon Operational
-
Horn Operational
-
Tramming/Reverse Alarm Operational
-
Lights Operational
-
Windshield Wipers and Washers
-
UHF/Communication System Operational
-
Emergency Stops Operational
Sign Off
-
FMG Representitive
-
Contractor Representitive