Information

  • WTG # and Receiving Exhibit

  • Project Name: Baffin Wind Project

  • Conducted on

  • Prepared by

  • Project Number: 13140009

  • Project Name: Baffin Wind Project

  • WTG #:

  • Delivery Date / Time

  • Location items were placed:

  • Shipping Company:

  • Record Ticket Number:

  • CMC Turbine Foundation Reference:

  • Supplier / Manufacturer:

  • Unload Date

  • Mill Certificates Received? If yes, check box:

  • Load Weight (lbs):

Anchor Bolt Assembly Parts

  • Parts Received? If yes, check box and complete section:

  • Threaded Rod received? If yes, enter quantity.

  • Nuts received? If yes, enter quantity.

  • Washers received? If yes, enter quantity.

  • PVC Sleeves received? If yes, enter quantity.

Foundation Reinforcement Steel

  • Parts Received? If yes, check box and complete section:

  • #4 Bar Received?

  • #5 Bar Received?

  • #6 Bar Received?

  • #8 Bar Received?

  • #9 Bar Received?

  • #10 Bar Received?

Other Items / Notes:

  • Photos:

  • Initial Inspection / Damage Notes / Other

  • Items delivered with no NCN's?

  • If no, are they closed?

  • Mortenson Receiver:

  • This form is an initial receiving document only. Final damage inspection of all items not readily visible due to shipping covers or packaging will take place at time of inventory or use.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.