Information

  • Client Name

  • Contact number

  • Email

  • Document No.

  • Conducted on

  • Location
  • Prepared by

Site Details

  • Site Usage

  • Grid / Off Grid

  • Desired Time For Completion

  • Planning Permission Required

  • Planning Permission Obtained

Annual Electrical Usage

  • kWh

  • £

  • Size of system desired required

Roof

  • Type

  • Roof Pitch

  • Roof Size (Sqm)

  • Orientation

  • Orientation Picture

  • Shading

  • Roof Condition

  • Gutter Height Above Ground (m)

  • Width of Property

  • Depth of Property

  • Access

  • Pictures

Electrical Assessment

  • Method of Connection to Consumer Unit

  • Proposed Location of Inverter

  • Meter Location

  • Meter Type

  • Main Earthing and Bonding

  • Distance fro Consumer Unit to Inverter

  • Pictures

  • Layout

  • Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.