Title Page
-
Machine Type
-
Conducted on (Date and Time)
-
Inspected by Shawn Tinker
-
LASER
-
Take a photo of the workspace.
-
Use these score criteria for your inspection:
1-COMPLETE. 2-INCOMPLETE.
SORT OUT - SEIRI
-
Inspection Period:
BSD-Before shift daily ASD-After shift daily
BAED-Before & after shift daily TW- Tuesday-Thursday
D-Daily
W-Weekly W/M-Wednesday Morning
6m-Every 6 months TE-Thursday evening -
Unnecessary items removed from work area?
-
Parts storage (organized & labeled)
-
Check nozzle condition & align
-
Check Pressure of Laser Gas
-
Check Pressure of both, nitrogen & oxygen gas
-
Power switch will not engage with lock out latch pulled up
-
Blow off air filter for control unit in back of laser
-
Clean slats on shuttle table
-
Main Control Panel Emergency stop is operable?
-
All parts in designated place in correct quantities
-
All carts & pallets in designated location
-
Shuttle table and area around machine clean and swept up
-
Brooms and dustpans in designated areas
-
All tools and supplies in correct locations
-
Empty barrel for dust collector & sweep up around collector
-
Blow off chiller screens
-
Clean & blow off control panel
-
Empty pans & vacuum under pans
-
Shuttle the table out & clean all side walls
-
Shuttle the table out & vacuum the tracks
-
Wipe down wall and doors with a clean rag
-
5000 hr Beam Purge filter changed
-
100,000 hr Beam purge filter changed
-
Farr Dust collector (4) cylindrical and (1) panel fliters
-
Full Name and Signature of the Inspector