Verify Item 1 - Butyl caulk at corners of panel under cap flashing.
-
Verify Item 1 Via Picture
-
Verify Item 2 - Foam between panel and cap flashing.
-
Verify Item 2 Via Picture
-
Verify Item 3 - Continuous butyl under roofing to panel under term bar. Verify continuous pressure under term bar. Verify zero air gaps.
-
Verify Item 3 via Picture
-
Verify Item 4 - confirm term bar attachment spacing.
-
Verify Item 4 via Picture
-
Verify term bar goes all the way to corner ( if applicable)
-
Verify Term Bar To Corner via Picture ( if applicable)
-
Verify one tube of butyl used for every 4 ft of wall.
-
Verify spray foam injected into every panel joint at top of wall