Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • no label
  • Verify Item 1 - Butyl caulk at corners of panel under cap flashing.

  • Verify Item 1 Via Picture

  • Verify Item 2 - Foam between panel and cap flashing.

  • Verify Item 2 Via Picture

  • Verify Item 3 - Continuous butyl under roofing to panel under term bar. Verify continuous pressure under term bar. Verify zero air gaps.

  • Verify Item 3 via Picture

  • Verify Item 4 - confirm term bar attachment spacing.

  • Verify Item 4 via Picture

  • Verify term bar goes all the way to corner ( if applicable)

  • Verify Term Bar To Corner via Picture ( if applicable)

  • Verify one tube of butyl used for every 4 ft of wall.

  • Verify spray foam injected into every panel joint at top of wall

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.