Title Page
-
Site
-
Conducted on
-
Prepared by
-
LEVEL
REQUIRED CHECKS
- NOTE : Before removing stainers, associated plant should be isolated {PUMPS/PRESSURISATION UNITS}
-
FCU Reference
-
Condense Drain Clean and or Disinfected
-
LTHW Strainer Clear
-
LTHW Actuator Operational
-
CHW Strainer Clear
-
CHW Actuator Operational
-
Fan Operating
-
Fan Speed Setting
-
Lagging Condition
-
Filter Clean & Undamaged
-
Unit Communicating with BMS
-
Other observations
-
Engineer signature