Information
-
FDT Observation Worksheet. Capital Restoration Project
-
FD Thomas, Inc
-
Conducted on
-
Prepared by:
-
Prepared by:
Location: (Select only one)
-
Job Site or Job Number
-
Level or Area
Use The Following Choices For The Observation (NI - Requires a comment)
-
EE = Exceeds Expectations. ME = Meets Expectations. NI = Needs Improvement.
Human Performance Tools
-
Plan of the Day or Job Safety Analysis or Pre/Post Job Brief
-
Crew discussion of the scope of the work for the day)
-
Procedure Use and Adherence
Hazard Recognition
-
Line of Fire
-
Barrier Tape or Rope / Signage
-
Hard Barricades / Signage
-
Compressed Gas or Bottles (either flammable or non-flammable)
-
Electrical Cord(s) / Inspected / Good Condition
-
Air Hoses / Connections / Whip-checks / Pins
-
Tools (good condition / inspected before use)
-
Ventilation
Housekeeping and Material Conditions
-
General Housekeeping (cleanliness)
-
Combustibles (properly stored / secured, labeled)
-
Work Area (cleanliness, orderly, hazmat controlled)
-
Lay-down yard (clean, uncluttered, easy access)
Personnel Protective Equipment
-
Head
-
Hearing
-
Eyes / Face
-
Foot
-
Hand
-
Respirator(s)
-
Body (Coveralls, etc.)
Fall Protection
-
Use of Fall Protection
-
Properly worn / adjusted
-
Properly anchored while in use
-
Ladder Use
-
Scaffold Use (mobile or permanent)
-
Dropped Object Control
Lifting and Rigging / Mechanical Material Handling
-
Vehicle usage procedures (aerial lift / forklift or lull)
-
Operator
-
Signal Person
-
Use of Spotter
-
Lift Area
-
Load Control
-
Softners
-
Cribbing
Manual Material Handling
-
Lifting and Carrying
-
Using assistance as needed
-
Using mechanical assistance (hand-truck, dolly, etc..)
You must answer both of these questions
-
Feedback Given to Crew or Individual
-
Debriefed Supervision