Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation / General Safety Items
-
Postings - Are required posters and signs on-site. (Can be in job trailer or office)
-
Weekly Safety Toolbox Talk Documented
-
Hazardous Communication Program - Employees know where MSDS's are located
-
Hazardous Communication Program - Employee has appropriate level of training for the work they are performing.
-
Housekeeping - Work area clean and uncluttered. Trash picked up and disposed of daily.
-
Pre-task / Pre-Job / JHA paperwork is complete and correct. Crew have correct permits.
Personal Protective Equipment
-
Hard hats (check for cracks & structural integrity) / No more than 5 years old
-
Safety Glasses (ANSI Approved) with side shields
-
Gloves - Right kind for the job / is the crew using them
-
Fall protection - Harness & Lanyard / Monthly inspection (Documented) / No more than 5 years old
-
Hearing Protection - Available & used / right type for the work
-
Mask or Respirator / Right kind for job / crew using them correctly
-
Face Shields / Welding Hoods
-
PPE (Special) - is there?
Program Compliance
-
Barricades / Signage
-
Lock-out / Tag-out
-
Excavation
-
Confined Space
-
Hazardous Material Control / Labeling
Tools
-
GFCI is used with all electrical equipment (As required by current site policy)
-
Tool(s) Electrical - Visual inspected before use / no cuts in outer sleeve / ground pin not missing / outer sleeve not pulled loose from end. / Proper current quarterly color codinw
-
Electrical cord(s) - Visual inspected before use / no cuts in outer sleeve / ground pin not missing / outer sleeve not pulled loose from ends / Proper current quarterly color coding
-
Tool(s) Hand- Visual inspection before use
-
Tool(s) Pneumatic - Visual inspection before use / not leaking / pinned or whip-checked when in use
-
Pneumatic hose(s) - Visual inspection before use / good condition, not leaking when in use
Equipment
-
Aerial lift(s) - Daily inspection
-
Air Compressor(s) - Daily Utility Equipment Inspection
-
Crane(s) - Daily Crane inspection
-
Forklift(s) / Lull(s) / Front-end loader(s) - Daily inspection
-
Generator(s) - Daily Utility Equipment Inspection
-
Ladder(s) - Daily visual inspection / Has current quarterly colored tape
-
Scaffolding - Daily inspection / Tag filled out by Competent Person
Rigging
-
Cargo strap(s) - Visually inspected before use
-
Chain falls - Visually inspected before use. Good working clips on hooks.
-
Shackle(s) & Hook(s) - Visually inspected before use
-
Sling(s) - webbing - Visually inspected before use
-
Sling(s) - endless - Visually inspected before use
-
Wire sling(s) - Visually inspected before use
Welding
-
Arc welding machine - Visual inspection of unit before use.
-
Gas welding bottles / hoses / gauges - Visual inspection of unit before use.
-
Gas cylinders - Properly stored and secure when not in use.
-
Welding shields or curtains in use (when needed or as required)
-
During all hot work / a Fire Watch is on station with a currently inspected fire extinguisher and proper hot work paperwork