Information
-
Document No.
-
PSC Observation Worksheet
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Location: (Select only one)
-
Turbine building
-
Aux building
-
Containment
-
Control Room
-
Fab Shop
-
Outside
-
Intake
-
Switch yard
-
Pri / Sec Lab
-
Training Center
-
Other
Use The Following Choices For The Observation
-
EE = Exceeds Expectations. ME = Meets Expectations. NI = Needs Improvement. UN = Un-satisfactory
Human Performance Tools
-
01. STA (Safety Task Assignment) or Pre/Post Job Brief
-
02. Self Checking (STAR, Flagging)
-
03. Verification (Peer Check, CV, IV)
-
04. Questioning Attitude (Two Min Rule, QV&V)
-
05. Procedure Use and Adherence
-
06. Communicate Effectively (3-Way, Phonetic Alphabet)
Hazard Recognition
-
07. Line of Fire
-
08. Barrier Tape / Rope
-
09. Barricades
-
10. Compressed Gas
-
11. Electrical Cord(s)
-
12. Hoses / Connections
-
13. Tools
-
14. Vehicles
Housekeeping and Material Conditions
-
15. Housekeeping
-
16. Combustibles
-
17. Work / Laydown Area
Personnel Protective Equipment
-
18. Head
-
19. Hearing
-
20. Eyes / Face
-
21. Foot
-
22. Hand
-
23. Body (Coveralls, etc.)
Rad Worker Practices
-
24. Rad Worker Practices
-
25. Dosimeters Use
-
26. RWP Knowledge / Adherence
-
27. Contamination Control
-
28. ALARA
-
29. Use of Rad Monitors
Foreign Material Exclusion
-
30. Boundaries / Barriers
-
31. FME Log / Monitor
-
32. FME Monitor
-
33. Work Practices
Lifting and Rigging
-
34. Softners
-
35. Cribbing
-
36. Lift Area
-
37. Operator
-
38. Signal Person
-
39. Load Control
Material Handling
-
40. Lifting and Carrying
-
41. Use of Spotter
Fall Protection
-
42. Use of Fall Protection
-
43. Ladder Use
-
44. Dropped Objects
You must answer both of these questions
-
Feedback Given to Crew or Individual
-
Debriefed Supervision