Information
-
Conducted on
-
Location
-
Prepared by
-
Signature
Health and Safety Checklist
Emergency Response
-
First Aid kits available and restocked
-
"Burns Card" available
-
Trained first aider on site
-
Fire extinguisher in place and in date
-
Water available
Personal Protective Equipment
-
Safety footwear worn
-
Hearing protection worn as required
-
Hand protection worn as required
-
High visibility clothing worn
-
Sun protection used
-
Respirators worn as required
Hazardous Chemicals
-
Safety data Sheets (SDS) avialable
-
Flammable liquids in approved containers
-
Containers labelled correctly
-
Used in approved manner
Plant & Equipment
-
Plant operators trained and qualified
-
Warning devices functioning
-
Pre-start inspections completed
-
Traffic management provisions in place
-
Used in accordance with SOP
-
Exclusion zones adhered to
-
Plant in good condition
Electrical Safety
-
Electrical items tested and tagged
-
Items RCD protected
-
No visible damage
General safety
-
Toolbox talk conducted
-
Contractors signed in
-
General housekeeping neat and orderly
-
SWMS, SOP's, Risk Assessments etc. completed
Environmental Checklist
Dust Management
-
Sprayers operational and being used effectively
-
Dust generated from equipment minimised (only essential plant)
-
Dust producing loads covered
Noise Management
-
Plant running minimised
-
Work conducted during approved hours
-
No excessive noise from plant
Chemicals
-
Chemicals stored securely
-
Spill response items available
-
Containers in good condition
-
Only approved chemicals on site
Waste Management
-
Waste disposed of thoughtfully
-
Reusable waste separated appropriately
-
Litter from crews collected
General Environmental
-
Operations within specified areas
-
Specific environmental plans (if any) adhered to and communicated
-
Plant in good condition. Minimal smoke, leaks, noise or dust
Quality Checklist
-
ITP's in use and completed correctly
-
Specific Quality Plan (if any) adhered to and communicated
-
Communication with client being undertaken
-
Customer or public complaints forwarded to management
-
Hold and inspection points utilised correctly
-
Non-conforming product isolated from use
-
Non-conformances being reported
-
Work only conducted in defined area
-
Sound workmanship