Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
FO number and cable sizes
Joint
-
Add media
Audit
-
1 . Cables formed correctly -<br>
-
2 . Cables have minimum coil length - 15 meters preferred
-
3 . Cable labels on every cable ( FO number if provided ,core count , location )
-
4 . Heat shrink ( shrank properly, straight, green paint gone ,foils installed correctly)
-
5 . Strength member installed correctly ( no tubes behind strength member etc. )
-
6 . Split pin fitted correctly if Express joint(oval port)
-
7 . Biscuits installed correctly in tube holders
-
8 . Tubes allocated in tube holders correctly ( as per colour code )
-
9 . Buffer tube lengths in tube holder cut to correct lengths (staggered )
-
10 . Trays labelled correctly ( including numbering on side of trays )
-
11 . All fibres clean ( no grease or dirt on active or dark fibres )
-
12 . Dark fibres in splice trays labelled and laced up on top of active fibres ( Or in dark fibre storage )
-
13 . Minimum of 3 wraps of fibre to be spliced in each tray
-
14 . Correct splice protectors used ( size ,heat shrunk properly , installed correctly )
-
15 . Rubber O ring has been fitted and joint seal clean.
-
16 . Desiccant pack in joint ( moisture bag )
-
17 . Flash tested joint ( max pressure 5 kpa )
Sign Off
-
Follow up Works Required
-
Auditor signature
-
Auditor signature