Survey Date & Location
-
Conducted on
-
Prepared by
-
Location
Building Overview
-
Take Overview Photos of the exterior of the building.
-
Add annotated screenshot of Google Maps or photo of PIA map showing building location.
-
List All floors within the building and the number range on each floor.
-
What is the total number of units at this Site?
BT Lead Ins
-
Add Photos of the BT Quad Box locations within the development in relation to the building.
-
Add Photos of BT Entry Points & DP boxes add notes to say where they are located within the building.
Comms Rack
-
Take Photos to show where the Comms Rack will be located. Dimensions are 60cmx60cmx45cm. Provide the following Notes: Which Block the Rack is to be installed in. Which floor the Rack is to be installed on. Which Room/Cupboard. E.g. "Comms Rack to be installed in The Cedars in the first floor electrical plant room."
-
Add Photos to show how the main fibre will be routed from incoming BT ducting to the Comms Rack. Provide notes detailing the route.
-
Add Photos to show how power will be provided to the Comms Rack. Take a photo of the consumer unit with cover lifted to show any spare fuses and then photos of a route from the consumer unit to the Comms Rack position.
-
Add Photos to show how the Fibre will link from the Comms Rack to the risers or each floor. Provide notes detailing the route.
Riser Cupboard Works
-
Are there Risers within the building?
Invisilight Cable Routes
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
-
Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.
Floor Plans
-
Add Drawings of Floor Plans for building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Add note to top of floor plan to say which building/floor it relates to and label the flat numbers on each floor.