Title Page
-
Site Name
-
Site ID
-
Site Size
-
Audit type
-
Site Location
-
Connectivity Type
-
Portfolio Name
-
Portfolio name
-
Installation completed by
-
Customer Connection Engineer
-
Site lead Name
-
Contractor Team at time of Installation
-
Contractor name
-
Turnkey provider
- MAP
- Virtua
- Pod Trak
- Elcom
- Other
- SPB Civil Engineering Ltd (Simon Banting)
- CGI
-
Other Turnkey provider name
-
RDM for deployment
-
FTM name
-
FTM Name
-
Auditing Compliance Officer
-
Conducted on
-
Compliance Region
- Scotland
- Birmingham to Borders
- London North (M4 corridor), South Wales
- London South, Kent & Southwest
Audit Log
Audit Information
-
All categories and items marked within in this report have been carried out in accordance with the Retro Customer Build audit procedural document v1.4
Distribution Point
-
Compliance status
Failed Samples
-
Location
-
Distribution point Compliance Fail
- HYPDP102 - Distribution point does not contain the correct fixings in line with Hyperoptic standards
- HYPDP104 - The distribution point is loose and unstable
- HYPDP105 - Distribution point cover is missing
- HYPDP107 - Distribution point is not security locked in line with Hyperoptic standards
- HYPDP108 Distribution point patching is not to standard
- HYPDP109 Distribution point patch Panel is not fixed
- HYPDP110 Distribution point door can not be closed due to Patch leads not installed to standard
- HYPDP111 Unable to close Distribution point door due to network equipment has not been installed to standard.
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Cabling
-
Compliance status
- HYPC100 - Non-Combustible fixings are not present
- HYPC101 - Non-combustible fixings are not present at intervals of 0.5m or less in communal/exposed areas
- HYPC102 - Non-combustible fixings are not present at intervals of 1m or less in non-exposed areas
- HYPC103 - 2 non-combustible fixings are not present above door or window
- HYPC106 - Cable ties not cut flush leaving sharp edges
- HYPC107 - Incorrect cable type installed for environment
Failed Samples
-
Location
-
Cabling Compliance fail
- HYPC100 - Non-Combustible fixings are not present
- HYPC101 - Non-combustible fixings are not present at intervals of 0.5m or less in communal/exposed areas
- HYPC102 - Non-combustible fixings are not present at intervals of 1m or less in non-exposed areas
- HYPC103 - 2 non-combustible fixings are not present above door or window
- HYPC104 - Catenary wire is not supported at intervals of 6m or less
- HYPC105 - Cable loom is affixed to a combustible support or a support that is not recognised as suitable support system
- HYPC106 - Cable ties not cut flush leaving sharp edges
- HYPC107 - Incorrect cable type installed for environment
- HYPC109 - Cable installation not in line with the proposal
- HYPC110 - Site marked as RFS, cable installation incomplete
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Weatherproofing
-
Compliance status
Failed Samples
-
Location
-
Weatherproofing Compliance Fail
- HYPWS101 - • No weather seal present within the aperture.
- HYPWS102 - • Degradable product used to seal the aperture.
- HYPWS103 - • Gaps present in the seal.
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Containment
-
Compliance status
Failed Samples
-
Location
-
Containment Compliance Fail
- HYPCON101 - Existing Containment install is not in line with the proposal
- HYPCON102 - New Containment install is not in line with the proposal
- HYPCON103 - Cables entering existing metal containment are not protected (for example the use of Ends caps, glands & grommets)
- HYPCON104 - Cables entering newly installed metal containment are not protected (for example the use of Ends caps, glands & grommets)
- HYPCON106 - Cover/Lid missing on newly installed containment
- HYPCON108 - Newly installed containment is loose & unstable
- HYPCON109 - Cabling within PVC trunking is not secured using non-combustible fixings
- HYPCON110 - Non-combustible fixings are not present at intervals of 0.5m, or less in communal/exposed areas within PVC trunking
- HYPCON111 - Non-combustible fixings are not present at intervals of 1m, or less in non-exposed areas within PVC trunking
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Fire Stopping
-
Compliance status
Failed Samples
-
Location
-
Fire Stopping Compliance Fail
- HYPFS101 - Technical detail not followed in line with the method statement or manufacture data sheet
- HYPFS102 - No reinstatement has been made around the service
- HYPFS108 - Gaps are present around the service
- HYPFS103 - Mastic applied over existing foam product.
- HYPFS104 - Unauthorised penetration into existing batt system.
- HYPFS105 - Unauthorised use of existing aperture.
- HYPFS106 - Unauthorised penetration into fire mortar.
- HYPFS107 - Unauthorised cable route through existing building defect
- HYPFSID101 - No ID label present.
- HYPFSID102 - Information ID label not legible
- HYPFSID103 - • ID label not affixed to cable using cable ties.
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Access panels/Hatches
-
Compliance status
Failed Samples
-
Location
-
Access Panel/Hatch Compliance Fail
- HYPAP101 - Hatch Cover missing
- HYPAP102 - Hatch frame not sitting flush to the ceiling.
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Invisilight (Discreet Cabling)
-
Compliance status
Failed Samples
-
Location
-
Invisilight (Discreet Cabling) Compliance Fail
- HYPIV101 - Invisilight cable loose
- HYPOE101 - POE not flush to wall
- HYPOE104 - Fibre not dressed correctly in POE
- HYPOE105 - POE is loose and unstable
- HYPOE106 - Invisilight fire clip not correctly fitted
- HYPOE107 - Incorrect POE box type installed
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Housekeeping
-
Compliance status
Failed Samples
-
Location
-
Housekeeping Compliance Fail
- HYPHK101 - Marks on walls and ceilings resulting from installation
- HYPHK102 - Evidence of engineer damage present resulting from installation
- HYPHK105 - Significant engineer waste left onsite post installation (For example Risers Cupboards, Intake Rooms, and Bin stores)
-
Engineer Remediation Notes
-
Evidence Of Remediation
-
The remediation is completed up to standard
Sign off
-
Audit result
-
Auditing Compliance Officer Sign Off
-
Audit Closure Date
-
Audit Closure Date is the date that the audit is passed over to the relevant stakeholder, and all investigations into auditory items are completed. This is not necessarily the date of the site/engineer visit
-
Has this audIt triggered remedial action(s)
-
As a result of non-compliance, a separate supplementary failed items report has been issued to the corresponding Infrastructure remediation owner for corrective action and closure via the documented JIRA process.
-
Remeditaion Owner (i.e. ADM/FTM/AFIM)
-
Site lead for the Remediation
-
Re-Inspecting Compliance Officer
-
Has the re-inspection triggered an escalation process
-
Has this audit recorded any advisories
Distribution Point advisories
-
Inspection advisories
-
Advisory images
C-OLT Advisories
-
Inspection advisories
-
Advisory images
Cabling advisories
-
Inspection advisories
-
Advisory images
Weatherproofing advisories
-
Inspection advisories
-
Advisory images
Containment advisories
-
Inspection advisories
-
Advisory images
Firestopping advisories
-
Inspection advisories
-
Advisory images
Access panel/Hatch advisories
-
Inspection advisories
-
Advisory images
Invisilight (Discreet Cabling)
-
Inspection advisories
-
Advisory images
Site Housekeeping Advisories
-
Inspection advisories
-
Advisory images
Site Documentation
-
Recorded Advisories
-
Advisory Images