Information
-
PM No.
-
Ready to Invoice?
-
Notification No.
-
Location # (Separate by comma if multiple)
-
Division
-
Address
-
MAT
-
Contractor
-
Crew Foreman Name
-
Field Inspector
-
Construction Completed On
-
QA Inspection Completed On
-
Field Inspection Performed?
-
Submission number
Quality Control Inspection - Field Only
-
1. Is the scope of work 100% complete? If work is remaining, check "No" and list the items needing to be completed in Notes.
-
2. Is the completed work free of quality issues? If quality issues are present, check "No" and list the issues in Notes.
-
3. Is the job built per the OH/UG Standards? If the construction is not in compliance with the standards, check "No" and list the issues below.
-
4. Are any changes to the original design reflected in the submitted as-builts, crew instructions, materials, joint pole forms, circuit map change sheets, etc. If the field conditions are not accurately reflected in the closeout package, check "No" and list the issues below.
-
5. Has a Construction Completion Standard Checklist (CCSC) been submitted for every significant facility? Are the forms filled out completely and accurately? If there are forms missing or the information on a submitted form is incomplete/inaccurate, check "No" and list the issues below.
-
Select OH and/or UG CCSC.
- OH CCSC
- UG CCSC
-
Select OH CCSC Issue/Issues
-
Select UG CCSC Issue/Issues
-
6. Has all required permanent restoration been completed? (Examples: Concrete, Asphalt, Sunken Box or Pole Hole etc.)
-
7. Add a minimum of 3 pictures of each location. (Bottom Half, Top Half, Whole Pole)
-
Reviewer's Signature
Document Review
-
1. Are any changes to the original design reflected in the submitted as-builts, crew instructions, materials, joint pole forms, circuit map change sheets, etc?
-
2. Is the job built per the OH/UG Standards? If the construction is not in compliance with the standards, check "No" and list the issues below.
-
3. Electric Equipment/Pole Information is complete?
-
4. Crew Foreman Sign-Off is complete (this includes Actual Circuit Feet Installed and confirmation of what condition the job was left in (ex: Built as Designed, Redlined, Feedback Form Completed, etc.)?
-
5. Electric Corrective (EC) Notification is complete (all applicable check boxes addressed, LAN ID or full name, signed and dated)?
-
6. Joint Pole documentation is complete. Forms are redlined as applicable?
-
7. Construction Drawings are complete. Drawings are redlined as applicable?
-
8. Is the Circuit Map Change Sheet complete? Are changes redlined as necessary?
-
9. Has a Construction Completion Standard Checklist (CCSC) been submitted for every significant facility? Are the forms filled out completely? If there are forms missing or the information on a submitted form is incomplete, check "No" and list the issues below.
-
10. Color photos are included for every location on the job?
-
Final Deliverable Review (Paperwork Only) - Total Number of Non-Conforming Items
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
-
Reviewer's Signature