Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Plot number
Bedrooms
-
Are all bedrooms ready to be signed off as complete? (include a picture of each bedroom)
-
Bathroom - Touch test tiles for grout or paint speckles. All chromes are buffed to shine.
-
Bathroom - Toilet seal and gel in place?
-
Is this area signed off as complete?
-
En-suite - Toilet seal and gel in place?
-
Is this area signed off as complete?
-
All areas need to be inspected for cleaning sign off as per cleaning spec. Detailed review of internal cupboards, glass and chromes, behind doors, window frames & mechanisms.
-
Kitchen - is this area signed off as complete?
-
Rooms - are all other rooms clean and signed off as complete?
-
Windows - are these left clean inside and outside and ready to be signed off as complete?
-
Any damage or defects to report?
-
Any trades in the property or evidence of work still outstanding? Kitchen appliances to be fit etc.
-
Is this home ready for full sign off