Information
-
Development Address:
-
Planning Permit No.
Memorandum: Final Inspection for Town Planning Permit
-
To: Development Engineer
Planning Officer -
From:
-
Date and Time:
-
Data works Document No.
Inspection Results:
-
Is this Final Inspection approved, allowing the release of all bonds applicable to this development site?
-
On this date (mentioned above), the drainage connection to Council asset and paving works constructed within the road reserve for the above project has been inspected by Council officers and the work has been completed to Council standards.
This document forms part of the overall documents required for the release of bonds applicable to this development site. -
Signed (inspecting officer)
-
As part of this inspection, the inspecting Council officer has noted issues with the completion of works that will not result in a satisfactory approval and release of any applicable bonds. Further works are required. See below for details:
-
Signed (inspecting officer)
Inspection details:
-
Have all pipes been installed?
-
Have all pipes been cut flush with pit walls and grouted?
-
All pipes have been installed correctly, cut flush with pit walls and grouted. ✅
-
🚫 All pipes have been installed correctly, however there is an issue with finishing. Comments:
-
🚫 There is an issue with the installation of pipes. Comments:
-
Have all pits been constructed as per plan?
-
Have all the pits been fitted with correct covers as per plan & to council standards?
-
All pits have been constructed as per the plan, adhere to design and/or standard drawings and are fitted with the correct covers.✅
-
🚫 All pits are constructed as per plan, however are not fitted with the correct covers. Comments:
-
🚫 There is an issue with the construction of pits. Comments:
-
Has the nature strip been reinstated?
-
The reinstatement of the nature strip has been approved. ✅
-
🚫 There is an issue with the nature strip reinstatement. Comments:
-
Have all connections to kerb been constructed to council standards?
-
All connections to kerb have been approved. ✅
-
🚫 There is an issue with the connections to kerb. Comments:
-
Has the vehicle crossing been constructed as per plan?
-
The construction of vehicle crossing/s has been approved. ✅
-
🚫 There is an issue with the vehicle crossing/s constructed. Comments:
-
Have road assets been reinstated around new works? - (crossing/kerb etc)
-
All road assets have been satisfactorily reinstated around new works. ✅
-
🚫 There is an issue with the level of reinstatement of road assets around new works. Comments:
-
Has footpath been reinstated?
-
The footpath has been satisfactorily reinstated. ✅
-
🚫 There is an issue with the reinstatement of the footpath. Comments:
-
Have works related to utility connections been reinstated? Check other side of road if required.
-
All works relating to utility connections, including across the road, have been satisfactorily reinstated. ✅
-
🚫 There is an issue with the reinstatement of areas around utility works. Comments:
-
Include any further comments:
-
Further comments:
-
Include any photos.
-
Photos:
-
Include a sketch if required to support above claims.
-
Supporting sketch: