Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
FINAL Q/A INSPECTION-HANDOVER
-
DATE & TIME
-
BLOCK ?
-
LEVEL ?
-
PLOT NUMBER ?
External works
-
Select date
-
Are all works damage free and clean I.e frames Panels paint work
-
Is glass damage free and clean
-
Are all gaskets correctly installed
-
All pressure plates and caps installed correctly
-
Are drainage caps installed
-
Are trickle vents installed
-
Are handles or covers installed
-
Are all Panels straight and gaps even as per detail
-
Have Panels been installed with lock in fixings and anti rattling clips
-
Is the vent location correctly installed as per detail
-
Add media
-
SIGNATURES BY M.PRICE
-
SIGNATURES BY WATES
-
Comments
INTERNAL WORKS
-
Select date
-
Are all works damage free and clean I.e frames Panels paint work
-
Is glass damage free and clean
-
Are all windows and doors operating correctly and locking
-
Are all handles installed correctly and working
-
Are all gaskets correctly installed
-
All keys together
-
Add media
-
Are trickle vents installed
-
SIGNATURES BY M.PRICE
-
SIGNATURES BY WATES
-
Comments