  • Program

Line

Station #

  • Start date and time of BUY - OFF review

SAFETY BUY-OFF INSTRUCTIONS

  • Signature and Date is required by the individual conducting

Machine Guarding

  • 1. All rotating components, gears, shafts, and belts guarded?

  • 2. Are all pinch points eliminated or guarded?

  • 3. Type of guarding used? 3e. Scanner guard?

  • 4. Are interlocks installed and operational w/ LOTO ability?

  • 5. Do interlocks shut down cell?

  • 6. Check palm button to restart

  • 7. Are there lighting changes within the cell to inform TM's of LOTO

Controls

  • 1. Are Palm buttons install and is there one for each operator at the station?

  • 2. Anti-tie down / Anti-repeat?

  • 3. Do the palm buttons have guards?

  • 4. Are the palm buttons placed in such a manner as to have ease of access and the operator is clear of hazards and danger?

  • 5. Are E-Stops in place, visible, and marked with red buttons?

  • 6. Are there E-Stop Cables and is the cable red and accessible?

  • 7. Are either style of E-Stop within reach of the operator?

  • 8. Are Stack lights or operational lights used for the work cell?

  • 9. Are the stack lights visible by the operator at the work cell?

Robotics

  • 1. Does each Robot have an independent controller with an E-stop?

  • 2. Is there an E-Stop on the teach pendent for each unit?

  • 3. Does activation of an E-stop on a teach pendent stop all robotic movement for all robots?

  • 4. Do the robot(s) have amber lights installed?

  • 5. Guarding types:

  • 5a. Muting Switches?

  • 5b. Hard stops?

  • 5c. Hand Cuffs?

  • 5d. Physical barrier? (fence, hard curtain)

  • 5e. Light curtain?

  • 6. Light curtain distance calculations available? (attach copy)

  • 7. Robotic risk assessment complete and available? (attach copy)

Control of Hazardous Energy

  • 1. Is the machine or equipment capable of being Locked Out?

  • 2. Is there an schematic drawing posted that indicates Lock Out points?

  • 3. Are Electrical points identified on drawing and machine? (disconnects, interlocks, switches)

  • 4. Are Pneumatic points identified on drawing and machine? (dump valves, pressure relief valves, gauges, piping hoses,<br>fittings, etc.)

  • 5. Are Hydraulic points identified on drawing and machine? (gauges, hoses, valves, pressure relief, blanking capable, etc.)

  • 6. Is there a set of drawings for the pneumatic and hydraulic systems?

  • 7. Does the fence have gates with interlocks?

  • 8. Has the control of hazardous light been accomplished?

  • 8a. Methods used for light reduction from operator point effective? (Can he or she see weld flash?)

  • 9. Has the machine been reviewed for sound emission?

  • 10 Are decibel readings acceptable?

  • 11. Has gravity as an energy source been evaluated and is there a hazard?

  • 12. Do the stored energy points have ID's and labels?

  • 13. Are Lock Out points ID'd in red (hasp, gate points, knobs, etc.)?

  • 14. Are Lock Out Placard's installed at each and all entry points?<br>

  • 15. Are Lock Out hasps attached to gate?

  • 16. Is there a picture of a proper lock out on each entry point?

Ergonomics

  • 1. Was a design Ergonomic risk assessment completed?

  • 2. Was there a build Ergonomic assessment completed?

  • 3. Are working heights acceptable?

  • 3a. What is the highest reach?

  • 3b. What is the furthest reach?

  • 4. Is operator position to tooling acceptable?

  • 5. Is operator position to materials acceptable?

  • 6. Is the operator lifting above 50 lbs?

  • 7. Is there a lift assist in place?

  • 8. Is the operator conducting repetitive motions in ergonomic body range?

  • 9. Is a lift assist table needed to bring materials in range of operator reach?

  • 10. Has a ERA or NIOSH calculations been completed?

  • 11. Are carts used to deliver materials to cell?

  • 12. Are Ergo mats in place?

  • 13. Are tool rest required for tool storage between cycles?

  • 14. Are tool balancers needed for tools?

  • 15. Is lighting of work station adequate?

  • 16. Has Ergonomic Ace been used to evaluate waste?

Physical Hazards

  • 1. Have risk assessments been completed?

  • 2. Does the work area have a minimum of 28 inches ingress /egress for the operator from cell or work station to a clears isle?

  • 3. Is there an isle with a minimum of 36 inches width for the operator to travel to an exit door?

  • 4. The Exits are identified?

  • 5. Trip hazards have been identified and eliminated on the outside of the cell? (i.e. cable tray, cables, pipes, air lines, etc.)<br>

  • 6. Trip hazards have been identified and eliminated on the inside of the cell? (i.e. cable tray, cables, pipes, air lines, etc.)

  • 7. All sharp corners have been identified and eliminated?

  • 8. All potential slip hazards have been identified and eliminated?

  • 9. There are Safety guards at work level and overhead where required?

  • 10. The catwalks or access ladders are in place and meet OSHA and ANSI regulations?

  • 11. All ladders have a swing gate that opens away from ladder?

  • 12. Fencing around cell has opening at floor of less than 8 inches?

  • 13. All guardrails are no less than 36 inches in height and no more 42 inches above guard surface with mid rail and toe board?<br>

  • 14. All structural components, floors, mezzanines, racks. etc. are marked with load limits?

Electrical

  • 1. Are all Electrical Panels Labeled with the following: Voltage and Amps?

  • 2. Does each Electrical panel list - supply from and supply to?

  • 3. On the inside of a covered panel is there list of what each breaker supplies?

  • 4. Exposed wires, broken conduit,?

  • 5. Are there any covers missing?

  • 6. Are there any use of extension cords or surge protectors?

  • 7. Are all switches on exterior of panels clearly marked?

  • 8. Are there any 110 v plugs at the cell? 9 Are high voltage signs used?

  • 9 Are high voltage signs used?

  • 10. is there a set of schematics available?

Color Codes

  • 1. Is all piping labeled according to ANSI and Magna standard?

  • 2. Are all Guards in caution yellow?

  • 3. Are all moving parts in warning orange?

  • 4. Are Emergency stops in red buttons or knobs with a yellow background and clearly marked?<br>

  • 5. Are start buttons green?

  • 6. Are containers, tankage properly labeled with content with GHS labels and volume?

Exposure Issues

  • 1. Are any vapors give off product or produced?

  • 2. Are any gases given off or produced?

  • 3. Is any dust produced?

  • 4. IS there any mist given off or produced?

  • 5. Have the Chemicals used in the process gone through approval process?

  • 6. Are SDS's available for all process, maintenance, and general use chemicals?<br>

  • 7. Will an IH air study be required?

Exposure Control Methods

  • 1. Are local exhaust hoods used in the process?

  • 2. Are Engineering dwgs available?

  • 3. Does the building have adequate ventilation and / or exhaust?

Fire Prevention and Protection

  • 1. All fire protection required is in place, extinguishers, sprinklers, flammable storage cabinets, etc.?

  • 2. Are all fire protection equipment ID' s in RED?

  • 3. Are all fire protection equipment accessible? 4h. Other substances not listed

  • 4. Are any hazardous substances used in this station or nearby?<br>

  • 4a. Corrosive?

  • 4b. Acids?

  • 4c. Flammable Liquids (solvents)?

  • 4d. Flammable gases?

  • 4e. Combustibles liquids?

  • 4f. Combustible gases?

  • 4g. Oxidizer?

  • 4h. Other substances not listed?

Cranes & Hoists & Lift Assists

  • 1. Load rated system, system capacity, posted ratings?

  • 2. Pendants labeled, tagged?

  • 3. E-stop buttons labeled and visible? movement?

  • 4 Are there warning devises that alert by standers of movement?<br>

Acoustics

  • 1. engineering controls for hearing protection have been evaluated, i.e. use of muffler, acoustical enclosure, vibration mounts, proper lubrication, sound absorbing material?

Sign Off's

  • Notes and Comments

  • This process has passed this initial inspection with associated notes and action items sent to appropriate team members.

  • Name of Auditor

  • Enter Date and Time

  • Process Owner

  • Enter Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.