Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Contact Details:

  • Add location

System Category:

  • System Category

FIre Alarm Checklist:

  • Are all cable insulation and continuity resistance measurements are logged and recorded (38.2)

  • Mains supply is dedicated, non switched, double pole isolated, correctly fused and labelled (25.2)

  • Mains supply is correctly identified at all distribution boards (25.2)

  • All batteries are clearly marked and labelled with date of installation (25.4)

  • Select date

  • Field wiring is labelled and correctly terminated in all control and ancillary equipment (26.2)

  • All detection, MCPs, warning, ancillary devices have been tested for correct operation and the results have been recorded (39.2)

  • Line isolators are fitted as appropriate, operate correctly and are marked on the drawings (13.2.3) (12.2.1)

  • Are there too many devices between any isolators e.g Apollo loop sounders max 10 (MFG Guide)

  • Are there any areas that are not covered by short circuit isolators (12.2.2)

  • There are a minimum of two sounder circuits installed (12.2.2)

  • Sound pressure levels have been checked and recorded on drawing or on the appendix to this checklist (39.2)

  • Remote signalling has been checked for correct operation to ARC (39.2)

  • Zone charts have been fitted in all appropriate locations (adjacent to control and repeaters) (13.2.4)

  • As fitted drawings are complete and have been updated where required, routing including including cable size

  • The premises have been left in a tidy condition and all materials and equipment removed from site (42.2)

  • Are there any callpoints missing from any exit of the building or floor level (39.2.10)

  • Are any callpoints wrongly positioned (39.2.10)

  • Are there any areas that lack detectors (39.2.11-16)

  • Are any detectors not suitable for there location or near air inlets / fans (32.2.11-16)

  • Are any detectors less than 500mm from walls / downstands (32.2.11-16)

  • Are any detectors spaced incorrectly - 7.5m Smoke / 5.3m Heat (39.2.11-16)

  • Are any detectors too far from the ceiling - 600mm Smoke / 150mm Heat (39.2.11-16)

  • Are any detectors near lights / obstructions (Must be more than 1.5 x depth of obstruction) (39.2.11-16)

  • Is there a mix of sounders and bells - Are sounders all the same tone (16.2.1c)

  • Are any locked stores not covered by LED's

  • Are there any trigger / sounder zones or auxillary outputs where the current loading is near or exceeds the limit (39.2)

  • Are there any devices at risk of false alarms? If so list below

  • List all special cause and effect, zone switching or interfacing and test for correct operation

  • Fire alarm zones - Please list below

Equipment and operational data required for:

  • Panel access code / key no

  • Number of zones

  • Number of spare zones

  • Power supply for repeater

  • Cores to repeater

  • Standby period

  • Battery size (calculation - Q x standby time + A x 1.25)

  • Quiescent current

  • Alarm current

  • Charger voltage

  • Communicator - Chip No

Addressable systems only:

  • Panel firmware details

  • Repeater firmware details

  • Software version at program

Commissioning Engineer:

  • Have all devices on the system been tested for correct operation (39.2)

  • Have all sounders been tested for correct operation

  • Have all cause and effect, relays, and PSU's on the sytem been tested for correct operation (39.2)

  • Does the system as commissioned comply with the fire category as designed? If not, record variations below (39.2)

I certify that the above checks and functional tests have been completed in accordance with manufacturers recommendations and / or applicable codes of practice:

  • Add signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.