Title Page
-
Site conducted
-
Plot Number
-
Conducted on
-
Prepared by
Untitled Page
-
Handover guide
-
Boiler Book Commissioning Checklist
-
Copy of CML cover note
-
Domestic Fire Alarm Install
-
Domestic Electrical Install
-
Gas Safety Record - Boiler
-
Appliance Install Report
-
NICEIC Certs
-
RICS Fire Safety Report
-
Plumbing Pack
-
EPC's
-
Robust Details
-
Extract Fan Cert
Keys and other items
-
Front door keys
-
Back door keys
-
Window Keys
-
Meter Box keys
-
Should this plot have a shower curtain?
-
Is the shower curtain fitted?
Lights / Heating and meter readings
-
Are all the lights off and the doors closed?
-
Is the heating on?
Meter Readings
Water
-
Meter serial Number
-
Meter Reading
Gas
-
Meter serial Number
-
Meter Reading
Electric
-
Meter serial Number
-
Meter Reading
-
Use the section below to add a record of any other items you feel should be recorded at this stage. You can make notes and or take photos
Additional items
-
undefined
Photos
-
Photo of front elevation
-
Photo of driveway
-
Photo of rear elevation
-
Photo of rear garden