Title Page
-
Certificate No.
-
This document is for: Waltham Forest Housing, Cedar Wood House, 2d Fulbourne Road, Walthamstow, London E17 4GG
-
Conducted on
-
Servicing Engineer
- Martin Barlow
- Tom Davey
- Ross Maxwell
- Terry bygraves
- Mark miller
- Dave Boon
- NunoCarrelo
QC
-
QC Control check
- Quarterly Vented Batteries
- Periodic Test/Inspection
- Inspection & Test over 12 Months
-
For Inspection & Servicing of the system
-
Name
- Martin Barlow
- Tom Davey
- Ross Maxwell
- Terry bygraves
- Mark miller
- Dave Boon
- NunoCarrelo
-
Position
-
Signature
Control system checks
-
System operational
-
Control panel sited at main entrance to block
-
System connected to CSL & Laurel House and has been tested
-
All cabling has be suitably protected from mechanical protection
-
All cabling wire in RED FP200
-
All firemans key operate switches are OPEN-CLOSE-Normal operation
-
All AOV'S are connected to a central battery PSU
Floor Checks
-
Floor level (Number floor and take photos)
-
Right side compartment
-
Middle section lift lobby
-
Left side compartment
-
Stairwell floor
-
Intake cupboard right side
Final Checks
-
QR Installed
-
PIB Updated with information
-
Display information adjacent to Control panel
-
Zone chart fixed to wall
-
Schematics provided (QR)
-
Certification provided (QR)
-
All works checked above are complete
-
Any further works please comment