Title Page
-
Document Number
-
These works are for solely the temporary and interim passive fire protection to areas only listed below. These works are not certified to a 3rd party accreditation and are not designed to be the final protection. To the detailed location below.
-
Client
- Waltham Forest Housing, 2d Fulborne Road, Cedar Wood House, Walthamstow, London E17 4GG
-
Conducted on
-
Supervisor
-
Full Site Address
Installation Area
GENERAL
-
Photo of front of building
-
HSE Folder read and signed
-
Typical photo of each corridor (1 only per floor)
SYSTEM
Area of works
-
Floor number
-
Location (by flat no....)
-
Photo of area before
-
Photo of completed area
-
Manufacturer of materials used
-
Hilti Fire Stop Board CP670
-
Hilti CP606 Firestop Acrylic Sealant 310ml
Completion
-
All works complete