Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Fire Drill Checklist
-
*Prior to Fire Drill, Warehouse Manager/Supervisor is to coordinate plan with Property Manager to ensure other building tenants, local Fire Department and Alarm Company are aware. This ensures no local emergency services respond, and sprinkler systems do not trigger.
-
This report to be completed immediately after each Fire Drill and a copy posted on the G: Drive or sent to Health and safety.
-
Facility:
-
Time Drill Began:
-
Time Building Cleared:
-
Time Ended:
-
Facility Evacuated to (Meeting Location):
-
Place YES or NO answers in spaces provided
Evacuation Team Personnel
-
Was the Fire alarm heard in all areas?
-
Team members reported to designated meeting area?
-
Team members carried out assigned Duties? (Facility search and Head count)
Evacuation
-
Were corridors and exits found clear? (no obstructions)
-
Did the evacuation proceed in an orderly manner?
-
Did the evacuation happen in a timely manner?
-
Were all doors closed but not locked on the way out of the building?
Remarks and Recommendations
-
Explain all “NO” answers and make additional comments or problems encountered
-
Signature: