Instructions:

  • Complete this form while conducting the inspection. The report should be maintained for one year and made available for review by Global Risk Loss Prevention Consultants.

Valve Inspections

  • Each locked valve must be tested monthly and visually inspected weekly. Each unlocked valve must be tested weekly. All inspections should be documented on this form.

  • Site:

  • Date:

  • Type:

Valves

  • Main Valve - Fire Sprinkler Cage - Main Plant

  • Status?

  • #1 Valve - Fire Sprinkler Cage - Main Plant/Back Flow

  • Status?

  • #2 Valve - Fire Sprinkler Cage - Main Plant/Back flow Isolation

  • Status?

  • #3 Valve - Fire Sprinkler Cage - Wet System 2nd Level

  • Status?

  • #4 Valve - Fire Sprinkler Cage - Dry system box storage shipping

  • Status?

  • The Global Risk Fire Protection Impairment Policy is used to guard against delayed reopening of valves. The "Red Tag Permit" should be used every time a sprinkler control valve is closed. When the valve is reopened, the 2 inch drain should be flowed wide open o be sure there is no obstruction in the piping. The valve should then be relocked.

  • Were any valves closed since the last inspection?

  • Were Global Risk Red Tag Permits used?

  • Was the valve(s) reopened fully and a 2 inch drain test made before the valve(s) was relocked or resealed?

Comments:

  • Additonal comments, remarks, etc.

Sprinklers (automatic)

  • Spare heads available?

  • Obstructed by high piling?

  • Any heads disconnected or needed?

  • Heat greater or equal to 40 degrees?

  • Min. Temp:

  • Water pressure at yard level:

  • Comments:

Dry Pipe Valves

  • Air Pressure?

  • Valve room properly heated? (min. 42 degrees fahrenheit)

  • Temperature (fahrenheit):

Housekeeping

  • Acceptable in flammable storage areas?

  • Flammable liquids not in-use properly stored?

  • Waste properly stored?

Fire Doors

  • Close properly?

  • Obstructed?

  • Blocked open?

Fire Extinguishers:

  • Charged?

  • All Acccessible?

  • Any Missing?

Egress

  • Routes Unobstructed?

  • Exit Doors Clearly Marked?

  • Emergency Lighting Working?

Fire Alarms

  • Test conducted?

  • Alarms audible throughout facility?

Information

Sign Off:

  • Inspected By:

  • Date:

  • Reviewed By:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.