Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
Safety Guidelines
-
Schedule work with operating staff.
-
Record results in the maintenance history file.
-
Follow site safety rules and your supervisor's instructions.
-
Obtain and review manufacturer's instructions.
-
Report any problems you find.
-
Record the results in the equipment history log.
Maintenance Procedures
-
Remove anything blocking easy access to the hose connection.
-
Inspect the cutoff valves and the check valves (usually located at base of standpipe riser) for rust or leakage. Exercise cut off valve and re-cap if necessary.
-
Remove the cap from the hose connection, and check the threads.
-
Crack the valve until water weeps through the valve. Then close the valve and check for leaks.
-
Screw the cap onto the valve until it is hand-tight.
Maintenance Hours
-
Time spent on work order?