Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fire Pumps
-
Are fire pumps started weekly
-
Annual Flow Tests
-
Maintenance Records are available and up to date
Deluge systems - Bulk Tanks
-
Flow Rate at Deluge<br>
-
How many BLOCKED NOZZELS are evidant
- 0
- 1
- 2
- 3
- 4
- 5
- >5
-
Add drawing
Deluge System - Tanker Bay
-
How many BLOCKED NOZZELS are evidant
- 0
- 1
- 2
- 3
- 4
- 5
- >5
-
Flow rate at Nozzels
-
Add media
Hydrants
-
Six Monthly Inspection up to date
-
Signs of Damage, Leaks or fitting damage
-
Add media
Fire Water Supply
-
Storage tank integrity adequate
-
Mains Water Supply
-
Add media
Fire Water Ring Main
-
Hydrostatic Test - last complete
-
Record details of achieved hydrostatic test pressure and report details.