Information
-
Site Name
-
Tenant
-
Conducted on
-
Prepared by
-
Location
Drawings & Certificates
-
Occupancy Certificate Received?
-
Action Taken:
-
Fire Safety Statement received?
-
Action Taken:
-
As built layout drawings received?
-
Action Taken:
-
As built mechanical drawings received?
-
Air balance performed and figures received?
-
Action Taken:
-
Action Taken:
-
As built electrical drawings received?
-
Action Taken:
-
As built hydraulic drawings received?
-
Action Taken:
-
As built essential services drawings received?
-
Action Taken:
Occupancy
-
Does the layout reflect the as built drawings supplied?
-
Action Taken:
-
Is all lighting in good working order? (including emergency and exit lights)
-
Action Taken:
-
Is air conditioning working and maintaining correct temperatures?
-
Action Taken:
-
Is carpet or floor covering in good condition?
-
Action Taken:
Tenant
-
Is the tenant set up in Property Assist?
-
Action Taken:
-
Does the tenant require training or follow up regarding the use of Property Assist?
-
Proposed training or follow up time and date:
-
Is the tenant aware of their responsibilities regarding tenancy works?
-
Action Taken:
-
Has the tenant labelled all allocated car spots?
-
Action Taken:
-
Have the tenant details been added to all directory boards?
-
Action Taken:
-
Has the tenant received allocated number of access control cards?
-
Action Taken:
Additional notes & sign off
-
Additional Notes:
-
Additional Media:
-
Sign Off: