Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Builder
- PDA
- PDL
- PDP
- Carlisle
- Henley
- Hermitage
- Quantum
- Other
-
Type of house
-
Has the site establishment checklist been completed for this job
SWITCHBOARD/ SUB BOARD
-
Correct size cable has been used with the correct circuit breakers
-
The switchboard has been labelled correctly
-
Slider on the top of the switchboard is closed
-
Do the sub circuits pass an insulation resistance test
-
Has the padlock been removed from the fuse bar
GENERAL
-
The Lights that were tested are in working order
-
The PowerPoints that were tested are in working order
-
Smoke detectors are all installed and working
-
Stair light have been installed correctly
-
Is the garage completed, including any conduit drops
-
Is the switch for the light in the roof within arms reach from the manhole
OUTSIDE
-
Are all outside heights as per plan
-
Are all outside items a min of 100mm clear of down pipes
-
The range hood has the outside vent installed
-
Are all outside items sealed with silicone
-
All rubbish is in the bin provided
-
Have the boxes & scrap cable from the outside items been cleaned up
OTHER
-
Has the job been cleaned and swept up
-
Are there any materials left on site
-
Is there any visible damage
-
Has a damage report been handed in
-
Is there an unfinished job report
-
Does the supervisor need to be contacted for any issues on this job
OTHER TRADES
-
Argus technologies
-
Heating and cooling
-
Tiling
-
Other notes:
-
photos relating to notes: