Information
-
Conducted on
-
Level Number.
- Ground
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
- 8th
- 9th
-
Apartment Number.
-
Prepared by.
-
Issued to.
- West Coast Office
- Sheen lane
Second Fix Small Power and Lighting
-
Second Fix By
-
Is the Consumer Unit complete with all MCB's, Blanks, fitted? All Labeling including Circuit Label's and Next Inspection Label
-
Is the Multi gang switch fitted
-
Is the Water heater connected, power on and left in Standby mode.
-
Is the Kitchen Second fixed
-
is the Power to the oven
-
Is there power to the Hob
-
Is the stove guard Fitted in to the Hob
-
Is there power to the Fridge
-
Is there power to the Extractor
-
Is there power to the Dish washer
-
Is the Shower/Bathroom Second Fixed including Mirror light and niche light
-
Is the Extract Fan Fitted in the Shower/bathroom
-
Is the Towel rail fitted
-
En-suit
-
Is the ensuit Second Fixed including Mirror light and niche light
-
Is the Extract fan Fitted
-
is the Towel rail Fitted
-
Are all the sockets and fused spurs fitted
-
Are all lights fitted and lined up
-
Is the outside light fitted
-
Are all the Light switches fitted and Switching Correctly
-
Are the smoke and Heat detectors fitted
-
Are all the Electric heaters fitted and left in Standby mode?
-
Is Apartment Complete?
-
Additional Comments?
-
West Coast Managers Name & Signature
-
Name
-
Sheen Lane Managers Name & Signature
-
Name