Information

  • Conducted on

  • Level Number.

  • Apartment Number.

  • Prepared by.

  • Issued to.

Second Fix Small Power and Lighting

  • Second Fix By

  • Is the Consumer Unit complete with all MCB's, Blanks, fitted? All Labeling including Circuit Label's and Next Inspection Label

  • Is the Multi gang switch fitted

  • Is the Water heater connected, power on and left in Standby mode.

  • Is the Kitchen Second fixed

  • is the Power to the oven

  • Is there power to the Hob

  • Is the stove guard Fitted in to the Hob

  • Is there power to the Fridge

  • Is there power to the Extractor

  • Is there power to the Dish washer

  • Is the Shower/Bathroom Second Fixed including Mirror light and niche light

  • Is the Extract Fan Fitted in the Shower/bathroom

  • Is the Towel rail fitted

  • En-suit

  • Is the ensuit Second Fixed including Mirror light and niche light

  • Is the Extract fan Fitted

  • is the Towel rail Fitted

  • Are all the sockets and fused spurs fitted

  • Are all lights fitted and lined up

  • Is the outside light fitted

  • Are all the Light switches fitted and Switching Correctly

  • Are the smoke and Heat detectors fitted

  • Are all the Electric heaters fitted and left in Standby mode?

  • Is Apartment Complete?

  • Additional Comments?

  • West Coast Managers Name & Signature

  • Name

  • Sheen Lane Managers Name & Signature

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.