Title Page

  • Doc number

  • Program Line Number

  • Conducted on

  • Prepared by

  • Site conducted

  • Level

  • Block

  • Plot Number/House Number

Drawing

  • Are services installed to the latest issued electrical drawings

  • Drawing reference number

First Fix - Cupboard

  • Are back boxes for sockets, spurs and data installed, set to correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Is lighting wired correctly and set out to the correct location

  • Is a fused spur ready for the water heater or HIU

  • Is the consumer unit wired correctly and set out in the right location

  • Is a spur ready for an MVHR unit

First Fix - Kitchen

  • Are back boxes for sockets and spurs installed, set to correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Is lighting wired and set out to the correct location

  • Are the smoke/heat detectors and external beacons wired correctly and set out in the correct location

First Fix - Living Room

  • Are back boxes for sockets and spurs installed, set to correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Is lighting wired and set out to the correct location

  • Are the smoke/heat detectors and external beacons wired correctly and set out in the correct location

  • Is a power supply ready for an MVHR controller

First Fix - ELV Services

  • Is the Data wired correctly and set out to the correct location

  • Do ELV cables have adequate metal fixings

  • Is the Telephone wired correctly and out to the correct location

  • Do ELV cables have adequate metal fixings

  • Is the Door Entry wired correctly and set out to the correct location

  • Do ELV cables have adequate metal fixings

  • Is the TV wired correctly and set out to the correct location

  • Do ELV cables have adequate metal fixing

  • Is the Fibre cable correctly wired and set out to the correct location with a minimum of 2meters of slack

  • Do ELV cables have adequate metal fixing

Heating thermostat/UFH

  • How is the House/Apartment heated

  • Are spurs installed in the correct location

  • Are thermostats wired correctly and set out in the correct location

  • Are thermostats wired correctly and set out in the correct location

  • Are thermostats wired correctly and set out in the correct location

First Fix - Bedrooms

  • Are back boxes for sockets and spurs installed, set to correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Is lighting wired and set out in the correct location

First Fix - Bathrooms

  • Are back boxes for Shaver/Vanity and spurs installed, set to the correct location and protruding adequately

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Are all cables cut to adequate length, marked and taped

  • Do LV cables have adequate metal fixings

  • Are all cables entering metal track/plasterboard according to requirements

  • Do LV cables have adequate metal fixings

  • Is lighting wired and set out to the correct location

  • Is extractor fan and isolator wired up and set out in the correct location

First Fix Completion

  • Any additional comments

  • Customer Signature

  • West Coast Foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.