Title Page
-
Doc number
-
Conducted on
-
Prepared by
-
Site conducted
-
Level
- Lower Ground
- Upper Ground
- Ground
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
- 8th
- 9th
- 10th
- 11th
- 12th
- 13th
- 14th
-
Block
- N/A
- Block A
- Block B
- Block C
- Block D
- Block E
- Block F
-
Plot Number/House Number
MVHR Ductwork
-
What unit has been installed ?
- Lo-Carbon Sentinel Kinetic Horizontal 200 ZMH
- Lo-Carbon Sentinel Kinetic CSH
-
How is the unit handed ?
-
Has it been installed like the above?
-
Has it been installed like the above?
-
Has it been installed like the above?
-
Has ductwork been sufficiently clipped ?
-
Has ductwork been sufficiently fixed & sealed ?
-
Is ductwork sufficiently insulated
-
Has ductwork been terminated onto external airbrick?
Spiggot Postions
-
Number of intake spigots
-
Number of exhaust spigots
-
Have measurements of all spigot locations been recorded?
-
Are all spigots placed inline with lighting arrangement or in another suitable position?
-
Has the appropriate length flexi duct been installed?
AC Ductwork
-
Have the correct sized plenums been installed within ?
-
Are Plenums securely fixed to the ceiling & FCU?
-
Has ductwork in between been securely clipped?
-
Are connections suitably fixed & sealed?
Completion
-
Any additional comments
-
Customer Signature
-
West Coast Foreman