Title Page

  • Doc number

  • Program Line Number

  • Conducted on

  • Prepared by

  • Site conducted

  • Level

  • Block

  • Plot Number/House Number

Drawing

  • Are services installed to the latest issued electrical drawings

  • Drawing reference number

Finals - Cupboard

  • Is a water heater or HIU installed

  • Is the water heater fused spur connected

  • Is the water heater powered on and left in standby mode

  • Does the HIU switch on

  • Do the HIU controls work

  • Is the consumer unit complete with all MCB's and blanks fitted

  • Is the consumer unit labelled including next inspection label

  • Is the multi gang switch fitted

  • Is there power to a washing machine

  • Is a MVHR fused spur installed

  • Does the fused spur switch on/off

Finals - Kitchen

  • Is there power to the oven

  • Is there power to the hob

  • Is a stove guard fitted to the hob

  • Is there power to the extractor

  • Is there power to the fridge/freezer

  • Is there power to the dishwasher

  • Is there power to the washing machine

  • Are all sockets and fused spurs fitted within kitchen

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Are the smoke and heat detectors fitted

Finals - Living Room

  • Are all sockets and fused spurs fitted

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Is a electric panel heater installed and level

Finals - Bedrooms

  • Bedroom electricals

  • Are all sockets fitted

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Is a electric panel heater installed with a fused spur

  • Are all sockets fitted

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Is a electric panel heater installed with a fused spur

  • Are all sockets fitted

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Is a electric panel heater installed with a fused spur

Finals - Bathroom/Shower/En-suite

  • Bathroom/Shower/En-suite

  • Are lights fitted and lined up

  • Do lights switch on correctly

  • Are lights fitted and lined up

  • Do mirror and niche lights switch on correctly

  • Is towel rail installed with fused spur

  • Is an extractor fan fitted

  • Is the fan isolator installed

  • Does the extract fan/light overrun function correctly

Finals - Outside lighting

  • Is outside light fully functional

Completion

  • Is apartment/house completed

  • Customer Name

  • Customer foreman

  • West Coast foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.