Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Inspection
-
Guards and handrails are provided for all platforms and stairways.
-
Platforms and stairways have kick boards fitted.
-
Platforms and stairways are free from trip hazards.
-
Grid mesh secure on all platforms.
-
Stairs and ladders even and secure.
-
Lighting provided is adequate on access walkways, stairways, and platforms.
-
Piping is adequately supported.
-
Piping is labelled to identify the contents, direction of flow.
-
Pump stop start stations are serviceable.
-
Pump guarding in place and secure.
-
Sump pump guarding in place and secure. Sump pump is operational.
-
Spillage around fixed plant is not excessive and does not present a hazard.
-
Concrete footings visible (clear of build-up) and structurally sound.
-
Electrical cables are adequately supported.
-
Electrical cables, cable trays and equipment are not damaged.
-
Are signs in place and prominently visible, e.g., Confined Space, No Smoking, HAZCHEM?
-
Are chemicals and reagent clearly identified? Are signs clean?
-
Are emergency signs in prominent positions: Fire Extinguishers and SDS?
-
Are mandatory signs visible: H2S monitors, dust masks, safety goggles?
-
Are barricades (soft and hard) adequate for the hazard they are protecting? Signs and information tags?
-
Are safety showers and eyewash stations operational? Is water temperature adequate for use?
-
Safety shower green lights working and signs in place.
-
Unobstructed access to safety showers and eyewash.
-
Any leaks in reagent area and piping / water / chemicals / lime / fuel farm?
-
Are fire extinguishers labelled, in-date, gauge in the green, off the floor, covered and signs displayed?
-
Fire extinguishers not obstructed and have easy access.
-
SDS available in Reagent storage areas.
-
PPE cabinets stocked.
-
Concentrate shed apron clean and drain clear.
-
Reagent portable bunds empty and in a serviceable condition.
-
Spill kits available and stocked. Checklist present in spill kit.
-
Area free of trip hazards, hoses rolled up and tidy.
-
Fuel farm bund empty, free of water and debris.
-
COPPER RESOURCES AUSTRALIA
-
INSPECTION TEAM
-
Name
-
Signature
-
Position Title
-
SUPERVISOR REVIEW / SIGN OFF
-
Name
-
Signature
-
CRA_PROCESS_F_027
-
Date of Issue: 04/10/2024 - Version 2.0
-
Page 4 of 4