Title Page
-
Conducted on
-
Prepared by
-
Location
-
Main Contractor’s name?
-
Number of operatives under supervision
-
Have all operatives signed in/ out as required
-
Briefly explain why operatives have not signed in
-
Are all operatives wearing suitable 5 point PPE?
-
Why is suitable PPE not being worn and what actions have been taken?
-
Have all operatives read and signed the project specific RAMS?
-
Why have the RAMS not been read & signed?
-
Is suitable task specific PPE being used where RAMS require it? For example RPE when floor fixing
-
What task has been undertaken and why has the relevant PPE not been used?
-
What PPE has been used?
-
Is there suitable segregation between working area and others? (Store Colleagues/ public/ other contractors)
-
Why is segregation not in place?
-
Is the working area being kept tidy, including trailing cables?
-
Why is the area not tidy and what actions are being taken to prevent accidents?
-
Are all materials being stored/ stacked safely?
-
Why are materials not being stored safely?
-
Has suitable plant/ mechanical aid been provided to assist in manual handling? For example pallet trucks & PAVS
-
What is the task and what mechanical aid is required?
-
Are there any other potential Health and safety concerns you may have on this particular site?
-
Please explain?