Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Location of Curtain Walling Screen

  • Block

  • Curtain wall

  • Elevation

  • Level

  • From Gridline

  • To Gridline

INSPECTION/QA

  • Has the brackets been fitted and torqued to the correct setting, as per elevation drawings 2001-2012?<br>

  • Has the mullions and transoms been fixed, lined & levelled as per elevation drawings 2001-2012?

  • Has the EPDM been installed correctly and the membrane is free from rips or tears?

  • Has the window and door inserts been fixed and glazed?

  • Do the handles work correctly?

  • Has the glass been installed in the correct orientation?<br>Is the glass free from defects?<br>Has the glass been viewed as per the industry standards?

  • Has the pressure-plate been installed and torqued to the correct setting <br>

  • Is the feature cover cap installed and free from defects

  • Has the louvres been installed?<br>

  • Has the frame been de-taped and cleaned?

SIGNATURES

  • Checked on Behalf of Fleetwood

  • Checked on Behalf of ??? (Deemed Acceptable if not returned within 2 Days)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.