Foundations

  • Foundation inspections are no longer required (at Fletchers discretion in the interim). Fletchers agree to provide:
    • PS3 documentation from the plumber for the under slab plumbing verifying compliance to the consent and building code and tested.
    • PS3 documentation from the foundation constructor verifying compliance to the consent and building code.
    • RoW from the foundation constructor
    • PS4 from the observing engineer.
    • Siting to be verified at framing stages by Council inspectors providing boundaries are clearly identifiable and location tolerances allow. Inspector may request surveyors cert (as would happen currently) if tolerances are too tight or boundaries are not easily identifiable.

  • Please select Foundation (slab) Contractor (LBP)

  • Please select Engineer/Consultant carrying out Siting/Inspections

  • Does this site require a Land Surveyor's Certificate?

  • Has the setout of the building ,Boundaries been defined and string lines in place?

  • Supply evidence

  • Bored Piles ?

  • Supply Evidence (Soil conditions and the size and depth of footings ; Piles must be in place but prior to placement of concrete).

  • Floor Slab Prep: Has the hard fill been compacted and DPM Placed; Reinforcement is tied and supported in chairs;starter bars fitted?

  • Supply Evidence

  • Signature requred for siting

  • Has the PS3 documentation from the foundation constructor verifying compliance to the consent and building code been completed and issued?

  • Supply Evidence

  • Has the RoW from the foundation constructor been completed and Issued ?

  • Supply Evidence

  • Has the Engineer completed the Site observation and issued at pre-pour stage?

  • Suppy Evidence (Consent Notes)

  • Has a PS4 from the observing engineer been completed and issued ?

  • Supervisors Signature to confirm Inspection completed

  • LBP Slab Contractors Signature to confirm Inspection Completed

  • Observing Engineers Signature to confirm Inspection Completed

Under Slab Plumbing and Drainage

Under Slab Plumbing

  • plumber for the under slab plumbing verifying compliance to the consent and building code and tested.

  • Please select the Plumbing Contractor

  • PS3 documentation from the plumber for the under slab plumbing verifying compliance to the consent and building code and tested completed and Issued ?

  • Supply Evidence (Plumbing PS3)

  • Are all the pipes under test and exposed for inspection?

  • Supply Evidence (Pipes, Bends, Connections, open trenches)

  • Plumber to sign work completed

  • Supervisor Sited and Inspection completed

Drainage

  • Drain laying can be undertaken and backfilled without Council inspection. Fletchers agree to provide Evidence of Inspections.

  • Please select the Drainage Contractor

  • Drainlayer (Employee) carrying out site works?

  • Suppy ID (Site Safe ID Okay/Drainlayer Rego)

  • Test Completed and sited by Supervisor and Drainlayer

  • Supply Evidence (Cap ends and pipes filled)

  • Supervisor Sited and completed Test

  • Drainlayer Signing off completed test.

  • PS3 documentation to be provided by the drain layer verifying compliance to the consent and building code noting connection compliance and test being completed and Issued ?<br>

  • Supply Evidence (PS3)

  • Has the Drainage asbuilt been completed with a copy in the consent pack or sent to Ade for documentation (FRL) ?

  • Supply Evidence

  • Drainlayers Signiture Confirmation (AsBuilt)

  • Supervisor Signiture Confirmation (AsBuilt)

  • Notes:

Brick 1/2 Height

  • Brick laying can continue without Council inspection at the ½ height stage.

  • Select the Brick/Block laying contractor

  • The contractor carrying out the site works a LBP?

  • Are the Bricks/Blocks supplied and layed with the correct material as per the consented plans?

  • Supply Evidence

  • Has the DPC, Flashings and Veep holes been contructed and completed in accordance with the consented plans?

  • Has the Mortar joint size and alignment been contructed and completed as per acceptable standard?

  • Have the correct cavity tolerances been adhered to as per the acceptable industry standard?

  • Has the 1/2 Height inspection met the acceptable requirements to proceed with the completion of the Brick facade construction?

  • Bricklayers Signature (Proceed)

  • Supervisors Signature confirm approval to proceed (1/2 Height)

  • Has a RoW from the installer (or supervisor licenced) been completed and Issued ?

  • Has the ROW been Issued/recieved upon completion of the Brick/Block laying?

  • Supply Evidence

  • Has the PS3 from the Installer verifying compliance to the consent, building code and any applicable specifications and/or standards completed and Issued ?

  • Supply Evidence.

  • Has the Bricklayer and Supervisor completed a QA upon completion of construction (Bricklaying) ?

  • Bricklayer

  • Supervisor

Postline Gib (Where no Fire rating)

  • Who is the LBP signing off the Bracing elements for this House lot?

  • Post Line Gib (where no fire rating):
    Stopping of installed internal wall linings without Council inspection. Fletchers agree to provide:
    • RoW from the installer (or supervisor licenced)
    • PS3 from the Installer verifying compliance to the consent, building code and any applicable specifications and/or standards.

  • Is there a set of consented approved building plans on site for Inspection?

  • Has site been swept out and rubbish removed and placed in skip?

  • Gib Board fixed as per the required Industry standard?

  • Have the wet areas been lined with the required board as per the consented plans ? (Aqualine)

  • Are the bracing patterns and linings on the consent plans completed as instructed in accordance with regulations?

  • Is the Supervisor convinced the work has been completed as per the consented plans?

  • Gib Fixer/LBP

  • Supervisor

  • Has the Consented plans Site Obervation form been signed and dated?

  • Has the RoW from the installer been completed and Issued ?

  • Has a PS3 from the Installer verifying compliance to the consent, building code and any applicable specifications and/or standards been completed and issued to FRL?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.