Title Page
1. UNIT
-
Unit clean and bund drained
-
Bund sealed and functional
-
Panel condition acceptable for age
-
Access doors sealing and latches in working condition
-
Decals present and legible
-
Sound insulation fitted and in good condition
2. COOLING
-
Radiator/coolers clean and core fins in good condition
-
Cooling hoses in good condition
-
Engine fan in good condition and installed with correct orientation
-
Coolant level correct and meets specification
-
Radiator cap fitted and in good condition
-
Coolant low level protection fitted and functioning
-
Cooling system passed pressure test
-
Cooling system functioning as designed
-
All guards fitted and in good condition
3. ENGINE
-
Engine shows no evidence of leaks
-
Oil level correct
-
Engine driven belts in good condition and correctly tensioned
-
All electrical connections tight and free of corrosion
-
All cables and harness secure and protected from rub points / hot spots
-
Engine mounts secure and in good condition
-
Engine breather run to outside of radiator
-
Intake hoses in good condition
-
New air cleaner(s) fitted
-
Exhaust secure and free from leaks
-
Exhaust lagging fitted and in good condition
-
Exhaust rain cap fitted and functional
-
All guards fitted and in good condition
4. ALTERNATOR
-
Alternator clean
-
Mounts secure and in good condition
-
All cables and harness secure and protected from rub points / hot spots
-
All electrical connections tight and free of corrosion
-
All guards fitted and in good condition
5. CONTROL PANEL
-
Panel functioning correctly
-
Parameters checked and set correctly
-
All displays/gauges operational and legible
-
Door secure and functional
-
All components checked and operational
-
All electrical connections tight and free of corrosion
-
All cables and harness secure and protected from rub points / hot spots
6. TESTING
-
Engine test results supplied and expectations achieved
-
Alternator load test results supplied and expectation achieved
-
Alternator resistance and insulation test results supplied and expectation achieved
-
Outlet test results supplied and expectation achieved
-
Electrical tagging in date and attached
7. TRANSPORT READY
-
Fuel removed
-
Marechal plugs removed, wiring made safe, plug inside unit and hole covered
-
Rain cap tapped closed
-
Storage protection measures in place
GENERAL INFORMATION
-
FMG Unit Number
-
Unit Serial Number
-
Purchase Order #
-
Company Name
-
Representative Name
-
Representative Signature
-
Date
-
FMG Representative Name
-
FMG Representative Signature
-
Date
OTHER
-
OTHER