Title Page

1. UNIT

  • Unit clean and bund drained

  • Bund sealed and functional

  • Panel condition acceptable for age

  • Access doors sealing and latches in working condition

  • Decals present and legible

  • Sound insulation fitted and in good condition

2. COOLING

  • Radiator/coolers clean and core fins in good condition

  • Cooling hoses in good condition

  • Engine fan in good condition and installed with correct orientation

  • Coolant level correct and meets specification

  • Radiator cap fitted and in good condition

  • Coolant low level protection fitted and functioning

  • Cooling system passed pressure test

  • Cooling system functioning as designed

  • All guards fitted and in good condition

3. ENGINE

  • Engine shows no evidence of leaks

  • Oil level correct

  • Engine driven belts in good condition and correctly tensioned

  • All electrical connections tight and free of corrosion

  • All cables and harness secure and protected from rub points / hot spots

  • Engine mounts secure and in good condition

  • Engine breather run to outside of radiator

  • Intake hoses in good condition

  • New air cleaner(s) fitted

  • Exhaust secure and free from leaks

  • Exhaust lagging fitted and in good condition

  • Exhaust rain cap fitted and functional

  • All guards fitted and in good condition

4. ALTERNATOR

  • Alternator clean

  • Mounts secure and in good condition

  • All cables and harness secure and protected from rub points / hot spots

  • All electrical connections tight and free of corrosion

  • All guards fitted and in good condition

5. CONTROL PANEL

  • Panel functioning correctly

  • Parameters checked and set correctly

  • All displays/gauges operational and legible

  • Door secure and functional

  • All components checked and operational

  • All electrical connections tight and free of corrosion

  • All cables and harness secure and protected from rub points / hot spots

6. TESTING

  • Engine test results supplied and expectations achieved

  • Alternator load test results supplied and expectation achieved

  • Alternator resistance and insulation test results supplied and expectation achieved

  • Outlet test results supplied and expectation achieved

  • Electrical tagging in date and attached

7. TRANSPORT READY

  • Fuel removed

  • Marechal plugs removed, wiring made safe, plug inside unit and hole covered

  • Rain cap tapped closed

  • Storage protection measures in place

GENERAL INFORMATION

  • FMG Unit Number

  • Unit Serial Number

  • Purchase Order #

  • Company Name

  • Representative Name

  • Representative Signature

  • Date

  • FMG Representative Name

  • FMG Representative Signature

  • Date

OTHER

  • OTHER

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.