Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Clinical Laboratory Mock Inspection Items

  • Please immediately remedy deficiencies events identified in this internal inspection report. Sign and submit this form to L&A once issues have been corrected (within 30 calendar days of inspection) or indicate whether further discussion, resources or other considerations are necessary for resolution.

  • Inspection Date:

  • Area Inspected:

  • Area Supervisor:

  • Inspectors:

Maintenance

  • Equipment maintenance records and function checks on file and current

  • Calibrations completed and current scales, thermometers, etc

  • Floor tiles are in good repair and clean

  • Air vents clean and functional

  • Ceiling tiles are clean and do not show evidence of leak or damage

  • Comments or Notes on Maintenance

Physical Lab

  • CAP signage and applicable lab permit is posted conspicuously

  • Only bench excerpts signed by lab director are posted

  • PPE available and being used as appropriate

  • No items stored directly on floor, under sink and less than 18" from ceiling

  • Unobstructed Safety Equipment (Fire Extinguishers, Safety Showers, and Eyewash Stations

  • Spill kits are available, stocked and employees know how to use them

  • Reagents and chemicals are appropriately labeled. No expired reagents in use

  • Reagents are labeled appropriately with received, opened and expiration dates

  • Acids, bases, and flammables are appropriately stored

  • Trash and biological waste are being disposed of appropriately

  • Sharps are discarded in a sharps container and not overfilled. Conveniently located and closed when not in use

  • Patient information is protected, handled and discarded appropriately per HIPAA

  • Handoff communication records are available for review

  • Applicable signage and warnings are posted such as Biohazard or exit signs, etc

  • Chemical inventories in order and up to date

  • Reagent lot to lot validations up to date

  • Equipment validations completed and on file

  • Equipment Labeled: Safety labels, PM/Calibration labels, Biohazard labels

  • Current laboratory charts and logs are in place and current e.g. temperature and humidity logs

  • Equipment logs and laboratory charts are appropriately reviewed and signed

  • Safety Data Sheets are available

  • Hallways, entrances, and exits are clear and unobstructed

  • Corrosives are stored above eye level

  • Eye wash stations are clean and checked on a weekly basis for function

  • Signage where UV lights are in use (Biological Safety Cabinets BSC)

  • Notes or Comments about the Physical Lab Section

Employee Files

  • Employee competencies completed at appropriate intervals using appropriate forms

  • Employee files are up to date and contain all necessary elements such as training records, degrees, licenses, verifications, etc

  • Fire safety, chemical safety, biohazard training and functional trainings are on file

  • Delegation documentation is on file and current a appropriate

  • Notes or Comments about the Employee Files

Employee Awareness

  • All employees sign and attest to review of applicable SOPs

  • Employees are aware of applicable safety and fire procedure e.g. how to access SDS and the location of the nearest fire extinguishers, fire alarm, safety showers, spill kits, etc

  • Employees all wearing ID above the waist

  • Relevant SOPs are available or accessible from inside the lab

  • Makeup application, cell phone use, food consumption is done only outside the lab

  • Employees wearing appropriate PPE for job function performed

  • Notes or Comments for Employee Awareness

Document Control

  • Relevant SOPs are on file and are readily accessible to all employees

  • All employees sign and attest to review of applicable SOPs

  • Lab Director or appropriate designees have reviewed and approved SOPs at appropriate intervals

  • Relevant SOPs are available in lab

  • Notes or Comments for Document Control

Proficiency Testing

  • Proficiency testing is being performed as appropriate

  • PT failures are investigated and addressed in a timely manner

  • Lab Director or appropriate designee signs evaluation reports within 2 weeks of receipt

  • Alternative assessments are conducted, documented an approved for tests where no commercially available PT options exist

  • Notes or Comments for Proficiency Testing

Mock Inspection Closure

  • I have reviewed the above listed inspection report and have not corrected the above listed issues for the following reason:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.