Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Clinical Laboratory Mock Inspection Items
-
Please immediately remedy deficiencies events identified in this internal inspection report. Sign and submit this form to L&A once issues have been corrected (within 30 calendar days of inspection) or indicate whether further discussion, resources or other considerations are necessary for resolution.
-
Inspection Date:
-
Area Inspected:
-
Area Supervisor:
-
Inspectors:
Maintenance
-
Equipment maintenance records and function checks on file and current
-
Calibrations completed and current scales, thermometers, etc
-
Floor tiles are in good repair and clean
-
Air vents clean and functional
-
Ceiling tiles are clean and do not show evidence of leak or damage
-
Comments or Notes on Maintenance
Physical Lab
-
CAP signage and applicable lab permit is posted conspicuously
-
Only bench excerpts signed by lab director are posted
-
PPE available and being used as appropriate
-
No items stored directly on floor, under sink and less than 18" from ceiling
-
Unobstructed Safety Equipment (Fire Extinguishers, Safety Showers, and Eyewash Stations
-
Spill kits are available, stocked and employees know how to use them
-
Reagents and chemicals are appropriately labeled. No expired reagents in use
-
Reagents are labeled appropriately with received, opened and expiration dates
-
Acids, bases, and flammables are appropriately stored
-
Trash and biological waste are being disposed of appropriately
-
Sharps are discarded in a sharps container and not overfilled. Conveniently located and closed when not in use
-
Patient information is protected, handled and discarded appropriately per HIPAA
-
Handoff communication records are available for review
-
Applicable signage and warnings are posted such as Biohazard or exit signs, etc
-
Chemical inventories in order and up to date
-
Reagent lot to lot validations up to date
-
Equipment validations completed and on file
-
Equipment Labeled: Safety labels, PM/Calibration labels, Biohazard labels
-
Current laboratory charts and logs are in place and current e.g. temperature and humidity logs
-
Equipment logs and laboratory charts are appropriately reviewed and signed
-
Safety Data Sheets are available
-
Hallways, entrances, and exits are clear and unobstructed
-
Corrosives are stored above eye level
-
Eye wash stations are clean and checked on a weekly basis for function
-
Signage where UV lights are in use (Biological Safety Cabinets BSC)
-
Notes or Comments about the Physical Lab Section
Employee Files
-
Employee competencies completed at appropriate intervals using appropriate forms
-
Employee files are up to date and contain all necessary elements such as training records, degrees, licenses, verifications, etc
-
Fire safety, chemical safety, biohazard training and functional trainings are on file
-
Delegation documentation is on file and current a appropriate
-
Notes or Comments about the Employee Files
Employee Awareness
-
All employees sign and attest to review of applicable SOPs
-
Employees are aware of applicable safety and fire procedure e.g. how to access SDS and the location of the nearest fire extinguishers, fire alarm, safety showers, spill kits, etc
-
Employees all wearing ID above the waist
-
Relevant SOPs are available or accessible from inside the lab
-
Makeup application, cell phone use, food consumption is done only outside the lab
-
Employees wearing appropriate PPE for job function performed
-
Notes or Comments for Employee Awareness
Document Control
-
Relevant SOPs are on file and are readily accessible to all employees
-
All employees sign and attest to review of applicable SOPs
-
Lab Director or appropriate designees have reviewed and approved SOPs at appropriate intervals
-
Relevant SOPs are available in lab
-
Notes or Comments for Document Control
Proficiency Testing
-
Proficiency testing is being performed as appropriate
-
PT failures are investigated and addressed in a timely manner
-
Lab Director or appropriate designee signs evaluation reports within 2 weeks of receipt
-
Alternative assessments are conducted, documented an approved for tests where no commercially available PT options exist
-
Notes or Comments for Proficiency Testing
Mock Inspection Closure
-
I have reviewed the above listed inspection report and have not corrected the above listed issues for the following reason: