Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Boundary clearance

  • Excavations<br>

  • Reinforcement

  • Moisture barrier

  • Termite treatment

  • Site drainage

  • Floor level check

  • Retaining walls/cut & fill barriers

  • Fill material compacted

  • Piers through fill

  • Sediment control

  • Sanitary drainage

INSPECTION RESULT

  • Inspection result

  • Inspections defects:

INSPECTOR

  • Select date

  • Inspector:

  • Inspector signature

CERTIFICATES (FORM 15/16) REQUIRED

  • Footing/Piers

  • Slab

  • Setout

  • Floor Level

  • Underslab termite

  • Perimeter

BUILDERS ADVICE

  • I confirm that the outstanding defects listed above have been completed.

  • Name

  • License class & number

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.