Placing of Formwork
-
Set profiles ensure they match the foundation plan
-
-
Ensure Waratahs have cap ends
-
-
ANY concerns contact the project manager
-
-
-
Install baseboard and drive pins to suit
-
-
Place shutters (ensure 2 men are lifting shutters into position) fix into position
-
-
Formwork plumbed
-
-
Knowledge how to brace formwork
-
-
Ensure all hardware is picked up and removed and placed back at BCP yard
-
Removing formwork
-
Remove bracing
-
-
Remove and clean shutters. All shutters need to be scraped and oil.
-
-
Remove pins and baseboard
-
-
Remove techs crews and nails from foundation/slab
-
-
Remove ALL rubbish from site
-
-
Ensure all material is stack for easy removal
-
-