Highbury Concrete Formwork Inspection
Risk Management & Work Planning
-
All workers involved in formwork operations have participated and signed the corresponding Daily Pre-Shift meeting.
-
All workers involved in formwork operations have reviewed and signed the corresponding job hazard analysis.
Pre-Form work
-
Are the approved formwork drawings available on site?
-
Are all areas being formed in accordance with the approved formwork drawings?
-
Please Indicate all formwork areas being inspected on this form. (2nd Floor/ elevator shaft, columns, walls.)
-
Is the competent person(s) for formwork installation on site and available? Please have each individual sign-off on their work
-
Wall Foreman: By signing below, I acknowledge that all formwork and braces are installed in accordance with the approved formwork drawings. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Deck Foreman: By signing below, I acknowledge that all formwork and braces are installed in accordance with the approved formwork drawings. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Column Foreman: By signing below, I acknowledge that all formwork and braces are installed in accordance with the approved formwork drawings. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Stair Foreman: By signing below, I acknowledge that all formwork and braces are installed in accordance with the approved formwork drawings. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
During Form work
-
Adequate bracing on all areas that have been formed. Include photo(s)
-
Did the designated competent person remedy this after being notified? Please include photo(s)
-
Shores vertically aligned using tell-tale devices.
-
Did the designated competent person remedy this after being notified? Please include photo(s)
-
Correct spacing and size of shores being used as per approved drawing.
-
Did the designated competent person remedy this after being notified? Please include photo(s)
-
Walls and columns have been plumbed using tell-tale devices
-
Formwork Watch Person(s) available to notify of potential formwork failures such as "blowouts."
-
Did the designated competent person remedy this after being notified? Please include photo(s)
-
Formwork Watch Person(s) are able to communicate with Concrete Safety Manager via radio.
-
Did the designated competent person remedy this after being notified? Please include photo(s)
Post-Form Work
-
Upon successful completion of concrete pour, please have each individual sign-off on their area of operation.
-
Wall Foreman: By signing below, I acknowledge that all formwork and braces were installed in accordance with the approved formwork drawings and has maintained structural integrity throughout concrete placement operations. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Deck Foreman: By signing below, I acknowledge that all formwork and braces were installed in accordance with the approved formwork drawings and has maintained structural integrity throughout concrete placement operations. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Column Foreman: By signing below, I acknowledge that all formwork and braces were installed in accordance with the approved formwork drawings and has maintained structural integrity throughout concrete placement operations. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Stair Foreman: By signing below, I acknowledge that all formwork and braces were installed in accordance with the approved formwork drawings and has maintained structural integrity throughout concrete placement operations. I further acknowledge that I am the competent person designated by Highbury Concrete for this operation.
-
Notify Concrete Safety Manager and Highbury Project Super immediately via email or text. Do not resume this report until you have received further instruction.
-
Comments / Notes ( Optional )