Information
-
Document No.
-
Audit Title Forth P.M. Checklist.
-
Conducted on
-
Prepared by
ACCESS
-
Access gate secure & locked?
-
Access road condition ok?
-
Access road verges clear?
-
Road entry sight distances are unobstructed by vegetation?
PUMP STATION BUILDING EXTERNAL
-
Access doors secure & locked?
-
Parking area fence secure?
-
Building structural condition ok?
-
Earth stake connected & in good condition?
-
There is no debris or equipment lying around that could be a slip/trip hazard?
-
Weeds controlled & low fire risk?
TRANSFORMER
-
Damage or signs of vandalism?
-
Danger High Voltage signs in place and in good condition?
-
Transformer no sign of leakage?
Pumps
-
Electric motors greased as scheduled?
-
Pump glands adjusted correctly?
Valves and Fittings
-
Non - return valves operating correctly?
-
valves and fittings free of leaks?
-
Test operate Isolating Valves annually (October)
-
Anti-cavitation valve operating correctly?
River Intake
-
No material blocking river intake?
-
Evidence of tampering with access hatch?
-
Confined space is labelled?
-
Safety barrier is present and able to be easily accessed for use?
Fire, Safety & Environment
-
Pump room fire extinguishers charged & serviced?
-
Internal & external lighting operating correctly?
-
Exit lighting operating correctly?
-
Fire alarm system in operation and checked within last month?
-
Fire extinguisher(s) checked within last 6 months and is current?
- Jan
- Feb
- Mar
- Apr
- May
- Jun
- Jul
- Aug
- Sep
- Oct
- Nov
- Dec
-
E-stop(s) checked? Date?
- Jan
- Feb
- Mar
- Apr
- May
- Jun
- Jul
- Aug
- Sep
- Oct
- Nov
- Dec
-
Access doors are unobstructed?
-
Any chemicals, fuels or oils are stored in a bunded area and MSDS is available on site?
-
Electrical equipment, plugs and extension leads are tagged and tested?
-
Work areas are tidy and free of rubbish?
Completed by
-
Completed by: