1.0 Safety Plans
-
1.1 Site Specific Safety Plan for Foushée?
-
1.2 Jobsite Crisis Management Plan?
-
1.3 Job Specific Phone Tree Posted?
-
1.05 Other?
2.0 Subcontractors
-
2.1 Site Specific Safety Plan for All Subcontractors?
-
2.2 Signed Contract for All Subcontractors?
-
2.3 Copy of Certificate of Insurance Received from Subcontractor?
-
2.05 Other?
3.0 Personal Protection
-
3.1 PPE
-
3.11 Hard hats as needed?
-
3.12 High visibility clothing as needed?
-
3.13 Eye protection as needed?
-
3.14 Hearing protection available as needed?
-
3.2 Barricades up where applicable?
-
3.3 Proper gloves in use?
-
3.4 Job-specific PPE as required?
-
3.05 Other?
4.0 Safety Equipment
-
4.1 Fire extinguisher(s) in place?
-
4.2 Fire extinguisher(s) inspections complete?
-
4.3 Eyewash available? Not expired?
-
4.4 First aid kit available?
-
4.5 First aid kit stocked properly?
-
4.05 Other?
5.0 General
-
5.1 Lighting?
-
5.2 Ventilation?
-
5.3 Nails removed from lumber?
-
5.05 Other?
6.0 Tools and Equipment
-
6.1 Proper tools in use/used properly?
-
6.2 Guards/safety devices in place?
-
6.3 Tools in good condition?
-
6.05 Other?
7.0 Body Positioning/Movement
-
7.1 Line of fire risk?
-
7.2 Attention to task?
-
7.3 Pinch points?
-
7,4 Proper lifting?
-
7.5 Pushing/pulling under control/balance?
-
7.6 Avoid/protected from sharp edges?
-
7.05 Other?
8.0 Housekeeping
-
8.1 Work areas clean and neat?
-
8.2 Trash cans available/emptied?
-
8.3 Hoses rolled and stowed?
-
8.4 Materials properly staged/stored?
-
8.5 Barricades maintained?
-
8.05 Other?
9.0 Fall Protection
-
9.1 Guardrails in place?
-
9.2 Warning lines used?
-
9.21 Warning lines least 15' back from all exposed edges?
-
9.3 Guardrails/warning lines installed correctly?
-
9.4 100% fall protection over 4' achieved?
-
9.5 Proper fall protection equipment?
-
9.6 Fall Protection Work Plan for work over 4'?
-
9.05 Other?
10.0 Working at Height/Scaffolding/Ladders
-
10.1 Decking complete w/o holes?
-
10.2 Scaffold tag in place/current?
-
10.3 Area below barricaded?
-
10.4 Ladder (portable) inspection complete?
-
10.41 All stickers legible and in their proper locations?
-
10.42 Ladder Guard installed on 2nd from top step, on all Foushée ladders?
-
10.5 Proper ladder setup? Proper ladder use?
-
10.6 Ladder extends 3' above landing?
-
10.61 Ladder secured at top and bottom?
-
10.7 Cage on vertical ladder over 25'? Rest platform(s)?
-
10.05 Other?
11.0 Walking Working Surfaces
-
11.1 Aisles/stairs/floors clear/clean?
-
11.2 Designated walking area?
-
11.3 Holes/depressions guarded?
-
11.4 Planks/mats on rebar for walking?
-
11.05 Other?
12.0 Vehicles/Mobile Equipment
-
12.1 Pre-use inspection complete?
-
12.01 Tires and body in good condition?
-
12.02 Vehicle lights, horn, etc. operational?
-
12.2 Speed limit and traffic controls followed?
-
12.3 Spotter used when appropriate?
-
12.05 Other?
13.0 Electrical
-
13.1 Assured Grounding complete? Correct color (Q1-white, Q2-green, Q3-red, Q4-orange)?
-
13.2 GFCI use on all power cords/tools?
-
13.3 Panel covers installed? Dead fronts installed?
-
13.4 Panels labeled and unobstructed?
-
13.5 Exposed wiring/knockouts?
-
13.6 Extension cords in good shape?
-
13.7 Lock Out/Tag Out/Test Out done correctly/adequately?
-
13.71 All electrical work done de-energized?
-
13.711 Preplanning complete for EE work?
-
13.712 Training documents available for EE work?
-
13.713 Proper equipment (PPE, barricades, etc.) available and in use for EE work?
-
13.05 Other?
14.0 Welding/Grinding/Temporary Power
-
14.1 Hoses, leads, cords hung properly?
-
14.2 Welding cables/temp cords free of damage?
-
14.3 Portable welding machine grounded?
-
14.4 Sparks controlled?
-
14.5 Fire watch present?
-
14.6 Fire watch trained?
-
14.05 Other?
15.0 Cranes/Lifting/Hoisting/Rigging
-
15.1 Crane(s) inspected/documented?
-
15.2 Operator NCCCO certificate?
-
15.3 Qualified signal-person? Documentation onsite?
-
15.4 Qualified rigger? Documentation onsite?
-
15.5 Ground is level/firm?
-
15.6 Rigging is inspected/undamaged?
-
15.7 Tag lines/softeners used?
-
15.8 Critical Lift Plan done, if required?
-
15.9 Overhead powerlines considered?
-
15.10 Personnel not under suspended loads?
-
15.05 Other?
16.0 Excavation Work
-
16.1 Daily inspection conducted?
-
16.2 Daily inspection documented?
-
16.3 Over 4' inspected by competent person?
-
16.4 Excavation shored/sloped/benched?
-
16.5 Spoils pile at least 2' from edge?
-
16.05 Other?
17.0 Confined Space
-
17.1 Attendant trained and alert?
-
17.2 Confined space signs posted at entrance(s)?
-
17.3 Personnel in confined space(s) checked in/out?
-
17.4 Ventilation in place/adequate?
-
17.05 Other?
18.0 Cylinders/Hazardous Materials/Flammables/Combustibles
-
18.1 Flammable/O2 bottles stored separately?
-
18.2 Gas cylinders upright/secured/capped?
-
18.3 Cylinder valves closed when not in use?
-
18.4 Proper storage containers for flammables/combustibles?
-
18.5 Secondary labeling for chemicals?
-
18.05 Other?
19.0 ILSM
-
19.1 Signage?
-
19.2 Dust control? Barriers? Penetrations blocked?
-
19.3 Badging?
-
19.4 Fire extinguishers?
-
19.5 Clear stairwells/exits?
-