Was the floor chalked pre-installing the frames?
-
Are all frames up?
-
Are the frames plumb?
-
Are the frames parallel?
-
Do the frames fit on the floor?
-
Do the frames need to be modified to sit on the floor?
-
Do the frames need to be packed up due to deviations on the floor?
-
Are the top plates on?
-
Are the window openings in the centre of the walls?
-
Are the window openings the correct size?
-
Has the aluminium fabricator ordered the windows?
-
Do we need to order special beams - steel or otherwise?
-
Are the interior door openings all located correctly - centre of the room?
-
Does the pre-nailer need to call back to modify the door openings?
-
Are all exterior lintels / beams on?
-
Are all lintels on site to install.?
-
Are we ready for the nets?
-
Have we discussed the garage door size with the carpenter in terms of optimal sizing?