Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
WHAT LINE ARE YOU ON
-
FRAME VENT BUILDERS NAME
-
LOT AND BIN
-
PICTURE OF THE SHOP PAPER
-
DO ALL FRAME MEMBERS LENGTHS MATCH THE SHOP PAPER
FRAME CORNERS
-
CORNER JOINTS SEALED AND HAD SQUISH OUT WHEN SCREWED TOGETHER
-
CORNER JOINTS ARE TOOLED AND SEALANT PRESSES INTO ALL CAVITIES
-
IF A VENT OPENING IS THE CORNER WIPED OF EXCESS SEALANT AND NOT HAVE EXCESS SEALANT
MEETING RAIL
-
THERMAL HAMMERS SEALED BEFORE THE MEETING RAIL IS ATTACHED
-
WAS SECONDARY SCREW FOR MEETING RAIL USED
-
MEETING RAIL JOINT SEALED CORRECTLY, INCLUDING THE HEADS OF BOTH SCREWS
FRAME ADAPTERS - REVERSE LEGS
-
WAS SEALANT APPLIED TO UNDERSIDE OF FRAME ADAPTER BEFORE ASSEMBLY
-
WAS ENOUGH SEALANT USED SO THAT THERE IS SQUISH OUT ALONG FULL LENGTH OF ADAPTER
FINISHED
-
IS THE MIDDLE WIDTH THE SAME AS THE HEAD/SILL AND NOT HAVE BOWED JAMBS
-
IF FRAME WAS NOT PLACED IN BAFFLE, WAS IT STACKED WITH FELT BETWEEN FRAMES
-
TAKE PICTURE OF FINISHED FRAME