Title Page
-
Job Name
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Foreman
-
1. Substrate to be free of debris.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
2. Staple end cap and division bar 16 inches on center.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
3. Panels to be cut with sheers.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
4. Apply adhesive with ¼ inch notched trowel.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
5. Apply adhesive over entire sheet. Apply within 1 inch of edge of panel.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
6. After sliding FRP sheet flush with division bar, back sheet out 1/8 inch to allow for expansion. Verify caulking of joints is not required.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
7. Outside corners: Use blue tape or cardboard to protect from damage.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
8. Clean excess glue off of panels as you go with Goof Off or similar product.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
9. Miter FRP trims cleanly.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
10. If installing FRP panels before quarry tile or base, use piece of tile base as a template to follow. If physical template is not available, GC must sign off on elevation. This ensures base and division bar meet cleanly.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
11. Cut holes with holesaw, caulk if necessary.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
12. Read installation instructions. Check to see if “Rolling” is required.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Conducted By:
-
Reviewed By: