Information

  • Member Company:

  • Conducted on:

  • Conducted by:

  • Member Company Representative:

General

I. POSTING OF NOTICES (29 CFR 1903 & 1904)

  • 1. "Safety and Health Protection on the Job" Poster (1903.2) is posted/on file.

  • 2. Current year's OSHA 300 Log and 5 years of previous Summary of Occupational Injuries (1904.5) is on file.

  • 3. Current OSHA 300A and 5 years of summary form posted (February-April).

  • 4. Emergency phone numbers are accurate and prominently posted.

II. NEW EMPLOYEE ORIENTATION

  • 1. Company has a New Employee Orientation Program.

  • 2. Documentation of training is available for new seasonal, part-time, full-time, and temp agency employees prior to exposure to job/task related hazards.

III. ACCIDENT REPORTING (29 CFR 1904)

  • 1. Communicated to employees the need to promptly report losses (all types).

Emergency Planning & Response

IV. EMERGENCY ACTION PLANS (29 CFR 1910.38)

  • 1. Facility has a written, updated and current Action Plan.

V. EMERGENCY PLANNING AND RESPONSE (PF-1) (29 CFR 1910)

  • 1. Company has a written, updated, and current Emergency Response Plan.

  • 2. Elements of the plan have been communicated to outside agencies.

  • 3. PPE and emergency equipment identified.

  • 4. Media coordinator identified.

  • 5. Necessary emergency PPE is available (i.e. Emergency respirators, rain gear, eye wash/shower, first aid kit. Etc.).

Hazard Communication

VI. HAZARD COMMUNICATION (29 CFR 1910.1200)

  • 1. A written Hazard Communication Program has been implemented.

  • 2. A list of chemicals at the facility is available.

  • 2A. All employees are trained when a new hazard (chemical) is introduced or when job duties change.

  • 3. Safety Data Sheets are available for each chemical on site.

  • 4. Contractors are informed about chemicals on site and provide information about chemicals brought on site.

PPE & Environmental Health

VII. HAZARD ASSESSMENTS (29 CFR 1910.132)

  • 1. Hazard Assessment program has been implemented.

  • 2. A PPE Matrix or equivalent is posted for employees to reference.

VIII. INDUSTRIAL HYGIENE MONITORING (29 CFR 1910.94, 1910.95)

  • 1. IH testing has been completed for Dust and control measures have been implemented.

  • 2. IH testing has been completed for Noise and control measure have been implemented.

  • 3. IH testing has been completed for Toxins and control measures have been implemented.

IX. PPE (29 CFR 1910.132 Subpart I)

  • 1. PPE is provided to employees.

  • 2. Procedures are in place to ensure defective or damaged PPE is not used and replaced.

  • 3. Procedures are in place to ensure employee-owned PPE is adequate.

X. RESPIRATORY PROTECTION (29 CFR 1910.134)

  • 1. When required, respirators are provided for employee use.

  • 2. When required, a written Respiratory Protection Program has been implemented.

  • 3. Program is reviewed at least annually or when new hazards are identified.

  • 4. Medical evaluations on file for applicable employees.

  • 5. Fit testing is conducted and documented.

Hot Work

XI. HOT WORK PERMITTING (29 CFR 1910 Subpart Q)

  • 1. Written Hot Work procedures have been implemented.

  • 2. Permit procedures document fire prevention and protection requirements.

  • 3. Procedures establish permanent Hot Work areas.

  • 4. Written procedures have been implemented for issuing Hot Work permit to outside contractors.

General Environmental Controls

XII. CONFINED SPACE (29 CFR 1910.146)

  • 1. All Permit Required Confined Spaces have been identified.

  • 2. Written Confined Space program has been implemented and is on file.

  • 3. When Permit Required Confined Space rescue is necessary, rescue will be performed by outside agency.

  • 4. Outside agency has inspected Permit Required Confined Space for hazards, identified rescue equipment needed, and conducted rescue drill.

  • 5. Copies of completed entry permits on file.

XIII. LOCKOUT/TAGOUT (29 CFR 1910 Subpart S)

  • 1. Location has implemented a written LOTO program.

  • 2. Assessment of Energy Sources Evaluation has been completed.

  • 3. Location has equipment-specific energy control procedures for applicable equipment.

  • 4. Location has identified Authorized LOTO employees.

  • 5. LOTO devices are available for use by Authorized employees?

  • 6. Periodic job task assessments are completed to verify implementation.

Training

XIV. TRAINING DOCUMENTATION (29 CFR 1910)

  • 1. Hazard Communication training is documented.

  • 2. Lockout/Tagout authorized employees training is documented.

  • 2A. Lockout/Tagout affected employees training is documented.

  • 3. Confined Space Entry Supervisors training is documented.

  • 3A. Confined Space Authorized Entrants training is documented.

  • 3B. Confined Space Attendants training is documented.

  • 4. Hot work training is documented.

  • 5. Personal Protective Equipment training is documented.

  • 6. Forklift formal training is documented (Safety Phase, computer program, lecture, etc.).

  • 6A. Forklift operator performance test is documented.

  • 7. Fire extinguisher annual training is documented.

  • 8. Grain handling operations training is conducted.

  • 9. Anhydrous ammonia competent attendant training is documented (annually or 3 years according to state regulation).

  • 10. Emergency action plan training is documented.

  • 11. First aid, CPR/AED training is documented (required when not close to medical facility).

  • 12. HAZWOPER training is documented.

  • 12A. HAZWOPER annual refresher is documented.

  • 13. DOT Reasonable Suspicion Supervisor training is documented.

  • 14. DOT Security Plan General Awareness level training is documented.

  • 14A. DOT In-Depth Security Plan training is documented.

  • 15. DOT Hazardous Materials training (Safety Phase 20 or equivalent) training is documented (every 3 years).

  • 16. DOT Entry Level Driver (Safety Phase 21) training is documented.

  • 17. Pesticide handlers under the Worker Protection Standard training is documented.

  • 18. Fuel (Safety Phase 5) training is documented.

  • 19. LP (Safety Phase 7) training is documented.

  • 20. Painting training is documented.

  • 21. Compressed gas & welding training is documented.

  • 22. New hire orientation training is documented.

DHS & DOT

XV. DOT HAZARDOUS MATERIALS SECURITY PLAN (40 CFR 172.802)

  • 1. A written copy of the DOT Security Plan is on file.

  • 2. All applicable appendices have been completed.

XVI. DOT (40 CFR 391 Driver Qualification)

  • 1. Application includes driving history.

  • 2. Current and previous 3 years of medical exam form are on file.

  • 3. Copy of road test for driver with tanker and current copy of CDL Drivers License.

  • 4. Copy of previous employer inquiry on file.

  • 5. Copy of current state motor vehicle abstract/MVR record on file.

  • 6. Copy of driver's report of violations for most recent year on file.

  • 7. Annual review of driver files is documented.

  • 8. Drivers receive training on motor carrier safety regulations and hazardous materials regulations every 3 years and documentation is on file. (Safety Phase 20).

  • 9. Driver files contain only required documents and are neat and orderly.

  • 10. Pre-employment drug testing is maintained.

  • 11. Random drug and alcohol testing is maintained.

  • 12. FSRIS is used to maintain driver information.

XVII. Department of Homeland Security (6 CFR)

  • 1. Documentation of Chemical Facility Anti-Terrorism System (CFATS) status available.

XVIII. Department of Transportation Regulation (40 CFR)

  • 1. Process to generate accurate shipping documents at the location.

  • 2. Record of shipping documents for the past two years.

  • 3. Emergency response information accompanies transfer of hazardous materials.

  • 4. Written drug and alcohol program implemented.

  • 5. Documentation of employee sign-off on the drug & alcohol policy.

  • 6. Current accident register and for the past three years.

  • 7. Procedures to keep proper logs and/or time records.

  • 8. Procedures for conducting pre- and post trip commercial motor vehicle inspections.

  • 9. Thorough vehicle maintenance files are maintained.

Grain

XIX. GRAIN OPERATIONS (29 CFR 1910.272)

  • 1. Implemented the written Grain Operations program.

  • 2. Documented and written Housekeeping Program available.

  • 3. Documented and written Preventive Maintenance Program available.

  • 4. The facility has a written Bin Entry policy and procedures.

  • 5. Facility has bin entry permits available and kept on file until the completion of the entry operations.

  • 6. Documented Sweep Auger entry policy and procedures.

Powered Industrial Trucks

XX. POWERED INDUSTRIAL TRUCKS (29 CFR 1910.178)

  • 1. Only authorized employees are permitted to operate forklifts.

  • 2. Training is conducted by certified trainers.

  • 3. Forklifts are examined daily.

Fire Extinguishers

XXI. PORTABLE FIRE EXTINGUISHERS (29 CFR 1910.157)

  • 1. Fire extinguishers are provided and intended for employee use? If No, skip to question 2.

  • 2. If fire extinguishers are not provided or intended for employee use, does the Emergency Action Plan provide for immediate and complete evacuation?

  • 3. Monthly fire extinguisher inspections are completed and documented.

  • 4. Annual service and maintenance are completed and documented.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.