Title Page

  • Comp. No.

  • Team

  • Type of Operation

  • Targets

  • Conducted on

  • Evaluator

  • Location

FSC and Legal Compliance

PLANNING

  • 1. Compartment planning available and sufficient

  • 2. Production targets available and in line with site conditions

CONTROL

  • 3. Harvesting operations executed according to plan

  • 4. Extraction routes sufficiently planned

  • 5. Stacking according to plan and accessible for transport

  • 6. Is workers utilized productively

  • 7. Is production for all activities available and kept on record - short interval

SAFETY AND PRODUCTION

  • 8. Safe work procedures and prescriptions adhered to

  • 9. Safety areas and safety signs displayed - correct distances on all access routes

  • 10. Competent supervisor on site

  • 11. Workers trained / inducted in task - job observations done

  • 12. PPE sufficient and correct for operation

  • 13. First aid bag on site and stocked according to OSHACT

  • 14. Equipment and tools in safe working condition

  • 15. Tools transported and stored safely

  • 16. Correct procedure for refueling, transport and storage of fuel

  • 17. Fire prevention tools available with emergency plan

CHAINSAW OPERATIONS

  • 18. Felling cuts according to safe work procedures

  • 19. Safe working distances respected - 2 tree lengths

  • 20. Operator PPE sufficient and correct for operation

  • 21. Chainsaw safe and well maintained

  • 22. Correct procedure for refueling, transport and storage of fuel

  • 23. Fire extinguisher available

QUALITY

  • 24. Timber lost limited - correct stump height and felling technique

  • 25. Log lengths and diameter correct recorded

  • 26. All utilizable timber removed

  • 27. De-branching correctly done

  • 28. Brush and crown cut up and spread into compartment and extraction routes

  • 29. Not stacking underneath powerlines

  • 30. Stacks according to plan and not inside road drainage

PROTECTION OF ASSETS

  • 31. Re-trip inspections done on checklist and signed by supervisor - all machines

  • 32. Vehicle safe, roadworthy, license with sufficient escape routes

  • 33. Vehicle not overloaded - number of passengers indicated

  • 34. Fire prevention tools available with emergency plan

ENVIRONMENTAL MANAGEMENT

  • 35. No pollution and rubbish removed - refuse bag available

  • 36. No damage to neighboring compartments and management areas

  • 37. Brush removed from conservation areas, drainage lines and road reserves (5m)

  • 38. No damage to road structures and drainage systems

  • 39. Hydro carbon spill kit available and emergency spill procedure known (Bio-gel)

  • 40. Timber not stacked inside or within 10m from forest ecotone

  • 41. Erosion or high erodible areas identified and action taken

ROADS

  • 42. Brush and blockages removed from side / miter drains and culverts

  • 43. Damage or erosion on roads reported

  • 44. Operation causing abnormal wear on road surface must be reported

  • 45. Post harvesting grade done?

  • 46. Not stacking 10m from any intersections or sharp curves

  • 47. Does road need out of cycle repair and maintenance? - Reported

GENERAL

  • 47. Clean drinking water available

  • 48. All containers marked

  • 49. Toilet paper and spade available

GENERAL COMMENTS

  • undefined

SIGN OFF

  • Supervisor Name and Signature

  • Evaluator Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.