Information

  • Site

  • Postcode:

  • Job Number Reference

  • Point of Work RA by:

  • Date:

Risk Assessment

  • What is speed limit for road?

  • What is traffic flow for the road? (Vehicles per minute)

  • What is pedestrian flow for the road? (Pedestrians per minute)

  • Any road features to be taken account of? (Eg Pedestrian crossings, zigzags, schools etc)

  • Is there a copy of Safety at Streetworks available on site?

  • A copy must be held on site or accessibble at all times

  • Does vehicle have working flashing amber beacon?

  • Works must be stopped immediately until beacon is fixed

  • Will task take up to 15 minutes?

  • Follow guidance on Page 87 - Mobile Works on Single Carriage Way

  • Will task take between 15 minutes and 60 minutes?

  • Follow guidance on Page 91 - Short duration on Single Carriage Way

  • Will works last for more than 60 minutes?

  • Work must be undertaken with full standard signing, lighting and guarding

  • Have any pits been opened?

  • Record readings on GDU

  • Ensure GDU is left in suitable location and countiously checked

Photographs of Area

  • Photographs of area pre setup

  • Photographs of area set up

Sign Off

Sign Off

  • Additional Notes / Information

  • Contractor Name

  • Contractor Address

  • Contractor Contact Details

  • Operative

  • Supervisor

  • Completed Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.